Sewage and sewerage of farm homes [1922] — John Shaqi
Sewage and sewerage of farm homes [1922]Warren, George M. (George Milton)
Science
Sewage and sewerage of farm homes [1922]
Warren, George M. (George Milton)
Sewage disposal, Rural; Sewerage, Rural
Especial attention is called to the shallowness of the vault and the
lightened labor of cleaning it out. The swinging door at the rear
facilitated the sprinkling of dry soil or ashes over the contents of the
vault, thus avoiding the necessity of carrying dirt and dust into the
building and dust settling upon the seat. This privy was in use for nearly
100 years without renewal or repairs. When last seen the original seat,
which always was kept painted, showed no signs of decay. Modern methods
would call for a concrete vault of guaranteed water-tightness,[3] proper
ventilation and screening, and hinging the seat.
[3] Directions for mixing and placing concrete to secure water-tightness
are contained in an article entitled "Securing a dry cellar," U. S.
Department of Agriculture Yearbook, 1919; published also as Yearbook
Separate No. 824, and obtainable for 10 cents from the Superintendent of
Documents, Government Printing Office, Washington, D. C.
[Illustration: Fig. 11.--Screening the approach to a privy. _A_, Raised
platform with lattice sides, suitable for short distances, convenient
and easily cleared of snow; _B_, walk hidden by lattice work; _C_, walk
enclosed by an arbor.]
[Illustration: Fig. 12.--A primitive vault privy in Massachusetts. Note
the tight, shallow, easily cleaned vault. _A_, Brick vault 5 by 6 feet,
bottom about 1 foot in the ground; _B_, water-tight plastering; _C_,
rowlock course of brick; _D_, door hinged at top; _E_, door button; _F_,
three-pane window hinged at top; _G_, passageway.]
Working drawings for a very convenient well-built two-seat vault privy
are reproduced in figures 13 and 14. The essential features are shown in
sufficient detail to require little explanation. With concrete mixtures of
1:2:3 (1 volume cement, 2 volumes sand, 3 volumes stone) for the vault and
1:2:4 for the posts there will be required a total of about 2 cubic yards
of concrete, taking 3-1/2 barrels of cement, 1 cubic yard of sand, and
1-1/2 cubic yards of broken stone or screened gravel. The stone or gravel
should not exceed 1 inch in diameter, except that a few cobblestones may
be embedded where the vault wall is thickest, thus effecting a slight
saving of materials.
CHEMICAL CLOSET.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account