Sewerage and Sewage TreatmentBabbitt, Harold E. (Harold Eaton)
History
Sewerage and Sewage Treatment
Babbitt, Harold E. (Harold Eaton)
Sewage disposal; Sewerage
Underground surveys are desirable along the lines of the proposed sewers
to learn of obstructions, difficult excavation and other conditions
which may be met. All such data are seldom gathered except for sewerage
systems involving the expenditure of a large amount of money. For
construction in small towns or small extensions to an existing system
the funds are usually insufficient for extensive preliminary
investigation. The saving in this respect is paid unknowingly to the
contractor as compensation for the risk in bidding without complete
information.
=15. Underground Surveys.=—These may be more or less extensive dependent
on the character of the district in which construction is to take place.
In built-up districts the survey should be more thorough than in
sparsely settled districts where only the character of the excavated
material is of interest and no obstructions are to be met.
Underground surveys furnish to the engineer and to prospective bidders
on contract work information on which the design and estimate of cost
and the contractor’s bid may be based and without which no intelligent
work can be done. By removing much of the uncertainty of the conditions
to be met in the construction of the sewer, the design can be made more
economical and the contractor’s bid should be markedly lower,
sufficiently so to repay more than the expense of the survey. The
information to be obtained consists of the location of the ground-water
level, and the location and sizes of water, gas, and sewer pipes,
telephone and electric conduits, street-car tracks, steam pipes, and all
other structures which may in any way interfere with subsurface
construction. These structures should be located by reference to some
permanent point on the surface. The elevation of the top of the pipes,
except sewers, rather than the depth of cover should be recorded, as the
depth of cover is subject to change. The elevation of sewers should be
given to the invert rather than to the top of the pipe.
A portion of the map of the subsurface conditions at Washington, D. C.,
is shown in Fig. 3. Many of the dimensions and notations are not shown
to avoid confusion on this small reproduction.[15] Colors are generally
used instead of different forms of cross hatching to show the different
classes of pipe and structures. In addition to a record of the
underground structures the character of the ground and the pavement
should be recorded. A comprehensive underground survey is seldom
available nor does time usually permit its being made preliminary to the
design of a sewerage system. The character of the material through which
the sewer is to pass should be determined in all cases.
[Illustration:
FIG. 3.—Record Map of Underground Structures, Washington, D. C.
Eng. Record, Vol. 74, p. 263.
Public-domain text, read in full here on John Shaqi.