BACKFILLING
=197. Methods.=—Careful backfilling is necessary to prevent the
displacement of the newly laid pipe and to avoid subsequent settlement
at the surface resulting in uneven street surfaces and dangers to
foundations and other structures.
The backfilling should commence as soon as the cement in the joints or
in the sewer has obtained its initial set. Clay, sand, rock dust, or
other fine compactible material is then packed by hand under and around
the pipe and rammed with a shovel and light tamper. This method of
filling is continued up to the top of the pipe. The backfill should rise
evenly on both sides of the pipe and tamping should be continuous during
the placing of the backfill. For the next 2 feet of depth the backfill
should be placed with a shovel so as not to disturb the pipe, and should
be tamped while being placed, but no tamping should be done within 6
inches of the crown of the sewer. The tamping should become
progressively heavier as the depth of the backfill increases. Generally
one man tamping is provided for each man shoveling.
TABLE 70
DIVISION OF COSTS FOR THE CONSTRUCTION OF CONCRETE SEWERS
Gillette’s Handbook of Cost Data.
──────────────┬────────────────────────────────────────────────────────
Item │ Location
──────────────┼─────────┬────────┬──────────┬──────────────────────────
│ Fond du │ South │ │
│ Lac │ Bend │Wilmington│ Richmond, Indiana
──────────────┼─────────┼────────┼──────────┼────────┬────────┬────────
Diameter in │ │ │ │ │ │
inches │ 30 │ 66 │ 53 │ 54 │ 48 │ 42
Shape │circular │circular│horseshoe │circular│circular│circular
Plain or │ │ │ │ │ │
reinforced │ plain │ rein. │ rein. │ rein. │ rein. │ rein.
Cubic yards │ │ │ │ │ │
per foot │ 0.11 │ 0.594 │ 0.37 │5″ shell│5″ shell│4″ shell
Daily │ │ │ │ │ │
progress, │ │ │ │ │ │
feet │ 47 │24 to 36│ │ │ │
Cost per foot,│ │ │ │ │ │
dollars │ 1.20 │ 4.40 │ 2.97 │ 1.35 │ 1.08 │ 0.91
Per cent of │ │ │ │
total cost: │ │ │ │
Labor │39.0[103]│ 33.5 │ 33.0 │ =17.1=
Tools │ 1.5 │ 11.5 │ │
Sand and │ │ │ │
gravel │ 12.4 │ 15.5 │ 18.9 │ =19.3=
Lumber │ 0.9 │ │ │
Water │ 0.7 │ 11.5 │ │
Reinforcing │ 0.0 │ │ 14.5 │ =22.3=
Cement │ 23.0 │ 20.0 │ 27.5 │ =32.0[104]=
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account