In the spring of 1756 Smeaton first visited and examined the Eddystone
rock, proving, as his predecessors had done, the extreme difficulty of
gaining a landing, or of remaining long enough on the rock to carry on
his observations. These difficulties suggested to him the important
and valuable expedient of keeping a vessel fixed within a quarter of a
mile of the rock, which should be capable of lodging the workmen and
their tools, and thus enable them to take immediate advantage of any
favourable opportunity of putting out their boat and conveying
materials at once to the Eddystone, instead of having to take the
voyage from Plymouth on each occasion.
The first actual work done on the rock was in August, 1756. Two
companies of workmen were employed, each remaining at the work a week,
that every opportunity might be made the most of, and the men relieved
by visits to the shore. A sloop, a large yawl with sails and oars, and
a boat, were employed to expedite the work. The sloop formed the
lodging for the company working at the rock, and was anchored at a
short distance from it. The sloop was afterwards replaced by a larger
store vessel, called the Neptune Buss. The weather from the 27th of
August to the 14th of September happened to be favourable to the work,
so that the companies were employed on it at every tide. After this,
unsettled weather began to prevail, so that Smeaton was obliged to be
satisfied with the progress already made, which consisted in the mere
preparation of the House-rock for the intended edifice, by cutting two
new steps in the lowest part of the sloping side of the rock, and
forming anew the five steps which remained of the efforts of Rudyerd.
Dove-tailed recesses were also cut in all these steps for the
reception of the stone-work. The remaining part of the autumn was
spent in expediting necessary work on shore, such as completing the
work-yard with its machinery and conveniences, and then preparing the
granite and Portland stone, of which the lighthouse was to be made.
The desirability of doing as much of the work as possible on shore,
became more and more apparent, as experience showed the dangers and
accidents likely to occur at the rock. During this winter Smeaton
began seriously to consider the great importance to his work, of
getting the most perfect cement possible, to resist the extreme
violence of the sea. He found that nothing of the resinous or oily
kind would answer, as it was impossible to get a dry surface at the
rock. He therefore went through a complete set of experiments on
cements with a view to produce one which would, in despite of water
almost continually driven against it with every degree of violence,
become so firm in its consistence and adhesion to the stone, that it
should compose one even regular surface with the stone, without
needing hoops of iron or copper to surround the horizontal joints. In
this endeavour he considered himself at length completely successful.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account