Stokers and pokers : $b or, The London and North-Western Railway, the electric telegraph, and the railway clearing-houseHead, Francis Bond, Sir
History
Stokers and pokers : $b or, The London and North-Western Railway, the electric telegraph, and the railway clearing-house
Head, Francis Bond, Sir
London and North-Western Railway; Railway Clearing House (London, England); Telegraph -- Great Britain
The question then arose whether, in the face of this tremendous
difficulty, the execution of the Kilsby Tunnel should be continued
or abandoned. The general opinion of the several eminent engineers
who were consulted was against proceeding, and certainly the amount
of the difficulties which were subsequently incurred, justified the
verdict. But in science, as well as in war, the word “IM_possible_”
can occasionally, by cool and extraordinary exertions, be divested
of its first syllable; and accordingly, Mr. Robert Stephenson
offering, after mature reflection, to undertake the responsibility of
proceeding, he was duly authorised to do so.
His first operation was of course to endeavour by the power of
steam-engines--the comrades of his life--to lower the water with
which he had to contend; and although, to a certain degree, this
attempt succeeded, yet by the draining of remote springs, and by the
sinking of the water in wells at considerable distances, it was soon
ascertained that the quicksand in question covered several square
miles.
The tunnel, 30 feet high by 30 feet broad, arched at the top as
well as the bottom, was formed of bricks laid in cement, and the
bricklayers were progressing in “lengths” averaging 12 feet, when
those who were nearest the quicksand, on driving into the roof,
were suddenly almost overwhelmed by a deluge of water which burst
in upon them. As it was evident that no time was to be lost, a gang
of workmen, protected by the extreme power of the engines, were
with their materials placed on a raft; and while, with the utmost
celerity, they were completing the walls of that short length, the
water, in spite of every effort to keep it down, rose with such
rapidity, that at the conclusion of the work the men were so near
being jammed against the roof, that the assistant-engineer, Mr.
Charles Lean, in charge of the party, jumped overboard, and then,
swimming with a rope in his mouth, he towed the raft to the foot of
the nearest working shaft, through which he and his men were safely
lifted up into daylight, or, as it is termed by miners, “_to grass_.”
The water now rose in the shaft, and as it is called “drowned out”
the works. For a considerable time all the pumping apparatus appeared
to be insufficient. Indeed the effort threatened to be so hopeless
that the Directors of the Company almost determined to abandon it,
but the engineer-in-chief, relying on the power of his engines,
prayed for one fortnight more; before that period expired Science
triumphed over her subterranean foe, and--thanks to the inventors of
the steam-engine--the water gradually lowered.
By the main strength of 1250 men, 200 horses, and 13 steam-engines,
not only was the work gradually completed, but during night and day,
for eight months, the astonishing and almost incredible quantity of
1800 gallons per _minute_ from the quicksand alone was raised by Mr.
Robert Stephenson and conducted away!!
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account