Stokers and pokers : $b or, The London and North-Western Railway, the electric telegraph, and the railway clearing-houseHead, Francis Bond, Sir
History
Stokers and pokers : $b or, The London and North-Western Railway, the electric telegraph, and the railway clearing-house
Head, Francis Bond, Sir
London and North-Western Railway; Railway Clearing House (London, England); Telegraph -- Great Britain
5. As soon as the Act of Parliament has been obtained, the chief
engineer directs the immediate construction of a most accurate plan
and section of the whole line, from which he ascertains and lays down
its gradients. He then determines the sizes of the bridges required,
as also the nature and amount of masonry for each; he calculates the
quantities of embankments and cuttings, balancing the one against the
other as nearly as circumstances will allow, and having, by first
boring, and afterwards by the sinking of “trial shafts,” ascertained
as accurately as possible the nature of the various strata to be
excavated or tunnelled, he proceeds to estimate in detail the
cost of the several works, which he then divides into lengths for
construction, taking care that in each the amount of earth to be
excavated and filled up shall as nearly as possible balance each
other; in short, inasmuch as all contractors prudently, and indeed
very properly, invariably lower their tenders in proportion as the
work they are required to execute has been clearly laid open to their
view, and, on the other hand, to secure themselves from unknown
difficulties, as invariably _raise_ their tenders for work which has
not been sufficiently bored or examined, he is fully sensible that
a considerable saving in the cost of the proposed railway will be
effected by a clear preliminary development of its works.
6. This mass of information having been prepared, the chief engineer
now advertises his work in its various lengths for execution by
contract, and, on receiving tenders for the same, he selects, not
always the _lowest_, but that which, for various reasons, is the most
_approved_, taking security generally to the amount of 10 per cent.
of the contract.
Previous, however, to the reception of the tenders the chief engineer
appoints his staff of assistants. To each 40 or 50 miles there
is usually appointed an experienced engineer, having under him
“_sub-assistants_” who superintend from 10 to 15 miles each--these
sub-assistants being again assisted by “_inspectors_” of masonry,
of mining, of earth-work, and of permanent way, to each of whom a
particular district is assigned.
7. The chief engineer now finds himself engaged in a new struggle
with man in addition to nature. In many instances the contractors
let out a portion of the work they have engaged to perform to
sub-contractors, who again “set” the earth-work to a body of
“navvies,” who again among themselves sub-divide it among the three
branches of which their State is composed, namely, “excavators,”
“trenchers,” and “runners,” each party of whom appoint their own
“ganger.”
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account