Studies in the South and West, with Comments on CanadaWarner, Charles Dudley
History
Studies in the South and West, with Comments on Canada
Warner, Charles Dudley
Canada -- Description and travel; United States -- Description and travel
The Manitoba system gridirons north Minnesota, runs to Duluth, puts two
tracks down the Red River Valley (one on each side of the river) to the
Canada line, sends out various spurs into Dakota, and operates a main
line from Grand Forks westward through the whole of Dakota, and through
Montana as far as the Great Falls of the Missouri, and thence through
the canon of the Missouri and the canon of the Prickly-Pear to Helena—in
all about 3000 miles of track. Its president is Mr. James J. Hill, a
Canadian by birth, whose rapid career from that of a clerk on the St.
Paul levee to his present position of influence, opportunity, and wealth
is a romance in itself, and whose character, integrity, tastes, and
accomplishments, and domestic life, were it proper to speak of them,
would satisfactorily answer many of the questions that are asked about
the materialistic West.
The Manitoba line west had reached Minot, 530 miles from St. Paul, in
1886. I shall speak of its extension in 1887, which was intrusted to Mr.
D. C. Shepard, a veteran engineer and railway builder of St. Paul, and
his firm, Messrs. Shepard, Winston & Co. Credit should be given by name
to the men who conducted this Napoleonic enterprise; for it required
not only the advance of millions of money, but the foresight, energy,
vigilance, and capacity that insure success in a distant military
campaign.
It needs to be noted that the continuation of the St. Paul, Minneapolis,
and Manitoba road from Great Falls to Helena, 98 miles, is called the
Montana Central. The work to be accomplished in 1887 was to grade 500
miles of railroad to reach Great Falls, to put in the bridging and
mechanical structures (by hauling all material brought up by rail ahead
of the track by teams, so as not to delay the progress of the track)
on 530 miles of continuous railway, and to lay and put in good running
condition 643 miles of rails continuously and from one end only.
In the winter of 1886-87 the road was completed to a point five miles
west of Minot, and work was done beyond which if consolidated would
amount to about fifty miles of completed grading, and the mechanical
structures were done for twenty miles west from Minot. On the Montana
Central the grading and mechanical structures were made from Helena as
a base, and completed before the track reached Great Falls. St. Paul,
Minneapolis, and Duluth were the primary bases of operations, and
generally speaking all materials, labor, fuel, and supplies originated
at these three points; Minot was the secondary base, and here in
the winter of 1886-87 large depots of supplies and materials for
construction were formed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account