The Argentine Republic: Its Development and ProgressDenis, Pierre
History
The Argentine Republic: Its Development and Progress
Denis, Pierre
Agriculture -- Argentina; Argentina -- Description and travel; Argentina -- Economic conditions -- 1918-
There is a fine black soil, very fertile when it is drained, and no
irrigation is needed; as it is possible, according to the depth of the
drainage-trenches, to regulate the level of the underground water so
as to make it reach and feed the roots. The draining of the marshes,
again, opens up a field for the further expansion of the estates,
especially at San Juan, where it has scarcely begun. Moreover, the
water that is obtained by draining the marshes enables them to create
new irrigated estates further on. At Mendoza there is already a
considerable area irrigated by drainage-canals (_desague_).
The level of the water in the marshes sinks in the summer and rises
in winter, at the time when the irrigation of the upper districts is
suspended or greatly reduced, and when the surplus of the _acequias_,
which the fields no longer take, flows or infiltrates downward in any
way that it can. Thus, contrary to the torrent itself, it is in winter
that the drainage-canals are at their fullest. At Barriales (Mendoza),
and on the lower course of the Zanjon canal, thousands of acres,
watered by the drainage-canals and exposed to drought in the summer,
have the right to take water from the river or the canal during the
three summer months, from November to January. During the remainder of
the year they are restricted to the use of the drainage-canals. This
sort of concession seems to provide a means of using the surplus of the
river during the summer.
With this exception there are no temporary rights limited to the
high-water season and enabling them to raise quick crops, that ripen
in a few months, round the area of perennials. At least, the expansion
of the estates and the wish to use the full water-supply have led to
the creation of eventual rights, besides the definitive rights. They
do not come into play, theoretically, until the definitive rights
have had their full supply, and then only in a fixed order. They are
subordinated to the ordinary rights, and the market value of land with
eventual water-rights is much lower than that of land with definitive
rights.[36] At San Rafael, where colonization preceded the systematic
inventory of the natural resources, the concession of eventual
water-rights was a means of facilitating the development of estates;
though they were very badly informed as to the surplus of the Atuel and
the Diamante and the area that the new land might cover.
[36] There are at present in the Mendoza province 275,000
hectares with a definitive right, and 303,000 with an eventual
right. The concessions fed by the Diamante and the Atuel at
San Rafael, which amount to 120,000 hectares with a definitive
right and 150,000 with an eventual right, are not yet entirely
developed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account