Sheers, gyns and derricks may well have been known in principle, but
for moving weights like those of obelisks, these are of no use except
in conjunction with the capstan and block and tackle. When the Luxor
obelisk was being lowered for removal, in spite of the elaborate
calculations of the stresses set up in the wooden sheers, and of the
good modern carpentry used in their construction and the steady pull
given by the capstans, the structure crushed and jammed, and it was
only by the use of screw-jacks that the necessary repairs could be
made. This was with a 227‐ton obelisk!
A method which may have been used, and which I should myself attempt if
I were entrusted with such a piece of work, is as follows:
(40) A square funnel is first built round and above the pedestal on
which the obelisk is to stand (see plate VIII), leaving a space about
half a metre high, and one and a half metre wide, clear over the edge
of the pedestal, to lead out to a tunnel. The sides of the funnel,
which are {39} of smooth masonry, are set at a slope so that the
obelisk on being lowered into it can lie against the wall of the slope
without passing its dead-centre and coming of itself to an upright
position. The sides of the funnel are continued upwards—perhaps in
brick, for economy—until the height of the funnel is well above the
centre of gravity of the obelisk; the higher, the better. Around the
funnel the brickwork would be brought out to form a square tower, with
the pylon wall for its revetement, perhaps, on one side. The tunnel
mentioned above leads from the pedestal to the further wall of the
tower.
A long sloping embankment (section 35) is made to lead up to the top of
the platform, and a gentle curve cut in the brick (A) to lead down to
the interior of the funnel. In the case of the obelisk of Ḥatshepsôwet,
the platform must have been at a high enough level to clear any
buildings in the way.
The obelisk is then pulled up on rollers, base foremost, until it just
overhangs the slope A. The funnel, previous to this, is filled with the
finest Aswân sand, which has very little cohesion in its particles,
banked high against the butt of the obelisk. The sand is then very
gradually removed from the tunnel, thus letting the obelisk slowly down
on to its pedestal. In this process, men would descend with the obelisk
until the masonry portion of the tunnel was reached. Precautions would
have to be taken, by banking the sand up before the butt of the obelisk
and, if necessary, by inserting wooden struts between the butt and the
wall B of the funnel, to prevent the obelisk jamming against it. After
the masonry is reached, there would be little fear of a jam.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account