Mr. Field was despatched to England, as there were no firms established
for the manufacture of submarine cables in the United States, to order
the necessary work to be done, and to raise money. He previously ordered
specimens of cable to be made, so that when he landed in England they
were ready for his inspection; and soon after his arrival he entered
into a contract with Messrs. Küper & Co. (subsequently Glass, Elliot, &
Co.) for a cable to be laid across the Gulf of St. Lawrence. He held
interviews with eminent engineers and electricians, among whom were Mr.
Brunel, Mr. (now Sir C.) Bright, Mr. Brett, and Mr. Whitehouse,
respecting his larger project, which led to extended and valuable
experiments. The cable for Newfoundland was formed in three strands, and
had three conducting wires; and Mr. Field undertook to lay it, under the
direction of Mr. Canning. In August, 1855, the first attempt was made;
but off Cape Ray a violent gale arose, and it was deemed necessary by
the master of the vessel to cut the cable. This disappointment was not
in the least a discouragement. Another contract was made by Mr. Field
with Messrs. Küper & Co. to make and lay a cable at their own risk,
which was executed by Mr. Canning in the Propontis the following year.
The station is at Point-au-Basque, near the western extremity of
Newfoundland, and the telegraph runs across the island to Trinity Bay.
The opportunities for scientific experiments afforded by the manufacture
of these cables were not neglected. The possibility of transmitting
signals under water without fatal loss of power from the increased
length of circuit was the first fact determined. The attention of the
experimentalists was then directed to ascertain whether, having regard
to existing theories, it would be possible to carry even a single
conductor across the Atlantic without the aid of a cable so ponderous
and so costly as to render it useless in a commercial point of view. A
series of direct experiments were at once undertaken, which resulted in
the establishment of the following facts:--first, that retardation of
movement, in consequence of increasing distance, did not occur at a rate
which could seriously affect a cable across the Atlantic; secondly, that
increased dimensions in insulated marine conductors augmented the
difficulties in obtaining velocity, so that bulk in a cable would not be
requisite; and, thirdly, that a velocity and facility which would
satisfy all mere commercial and financial requirements in a line
crossing the Atlantic, might be attained in the largest circuits. The
next step was to actually make signals through 2000 miles of wire. This
was accomplished through the kindness of the directors of the English
and Irish Magnetic Company, who placed at the disposal of the
experimentalists 5000 miles of under-ground wire. On the 9th of October,
1856, in the quiet of the night time, the experiment was tried
successfully. Signals were distinctly and satisfactorily telegraphed
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account