The Bark Canoes and Skin Boats of North AmericaChapelle, Howard Irving
History
The Bark Canoes and Skin Boats of North America
Chapelle, Howard Irving
Canoes and canoeing -- North America; Indians of North America -- Boats; Skin boats -- North America
The bark cover was sometimes in one piece; when it was pieced out for
width, the harness-stitch was used. In most canoes, the bark along the
gunwale was doubled by adding a long narrow strip, often left hanging
free below the gunwales and stopping just short of the _wulegessis_,
which it resembled. It was sometimes decorated. A few St. Francis
canoes with nailed gunwales omitted this doubling piece. When used,
the doubling piece, as well as the end cover, were folded down on top
of the gunwale before being sewn into place. The decoration of the
St. Francis canoes seems to have been scant and wholly confined to a
narrow band along the gunwale, or to the doubling pieces. The marking
of the _wulegessis_ had ceased long before Adney investigated this type
of canoe and no living Indian knew of any old marks, if any ever had
been used.
[Illustration: Figure 82
LOW-ENDED ST. FRANCIS CANOE with ~V~-form end sections made with short,
~V~-shaped keel battens outside the sheathing at each end. Note the
unusual form of headboard, seen in some St. Francis canoes.]
The ends were commonly lashed with a spiral or crossed stitch, but
some builders used a series of short-to-long stitches that made groups
generally triangular in appearance. The gunwale lashing was in groups
about 2½ inches long, each having 5 to 7 turns through the bark. The
groups were about 1½ to 1¼ inches apart near the ends and about 2
inches apart elsewhere. The groups were not independent but were made
by bringing the last turn of each group over the top and inside the
main gunwale in a long diagonal pass so as to come through the bark
from the inside for the first pass of the new group. The caps were
originally pegged, with a few lashings at the ends.
The ribs were bent green. After the bark cover had been sewn to the
gunwales, the green ribs were fitted roughly inside the bark, with
their ends standing above the gunwales, and were then forced into the
desired shape and held there, usually by two wide battens pressed
against them by 7 to 10 temporary cross struts. After being allowed to
dry in place, the ribs were then removed, the sheathing was put into
place, and the ribs, after a final fitting, were driven into their
proper positions. Some builders put in the ribs by pairs in the shaping
stage, one on top of the other, as this made easier the job of fitting
the temporary battens. The forcing of the ribs to shape also served to
shape the bark cover, and the canoe was placed on horses during the
operation, so that the shape of the bottom could be observed while
the bark was being moulded. Some builders used very thin longitudinal
battens between the bark and the green ribs to avoid danger of bursting
the bark.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account