The Bark Canoes and Skin Boats of North AmericaChapelle, Howard Irving
History
The Bark Canoes and Skin Boats of North America
Chapelle, Howard Irving
Canoes and canoeing -- North America; Indians of North America -- Boats; Skin boats -- North America
The skins were sewn together lengthwise, lapped about 6 inches or a
little less, and secured by a double row of stitching. If the hair had
not been removed, it had to be scraped away along the sewn edges. In
such a case the hair would usually be on the outside of the finished
canoe. Also, before work was started on assembling a canoe, the skins
were worked pliable, and tallow and gum were accumulated.
When an emergency canoe was ready to be assembled a smooth place was
prepared; either an open bit of ground or the floor of the hunter's
hut, if large enough, might be used. The outlines of the gunwales were
fixed by a few stakes temporarily driven around it and then pulled
up. The skins were then laid on the bed and the gunwale frame placed
on them and weighted with stones. Then the skins were left to dry for
awhile until they became somewhat stiff; the proper condition was
indicated by the curling of the edges.
When the skin was sufficiently stiff, the gunwale frame was lifted and
temporarily secured to the stakes redriven in the bed, the sides of the
skin were turned up, the skin was gored, and sometimes the ends of the
gunwales were sheered up slightly at the end stakes; this latter was
not always done, for in some canoes the sheer was quite flat.
The skins were now trimmed to the sheer of the gunwales and the edges
lashed to these members with rawhide, the gores also having been
sewn. Next the stem-pieces were put into place and the stem heads
lashed inside the apex formed by the ends of the gunwales. Some ribs
were then bent and forced down on the stiff skin cover, the rib ends
being worked into the holes prepared for them on the underside of the
gunwales. These ribs usually stood approximately square to the curve,
or rocker, of the bottom. Now the skin could be trimmed to the stem
profiles and sewn. The stitching was usually done so as to be outside
the stem-pieces, with an occasional turn going around inside them to
help hold the structure in place. Some builders first put in the stems
temporarily and then trimmed the skins to match; after this was done
the stem-pieces were removed to allow easy sewing. When they were
replaced and secured permanently, a few more stitches were added along
the stems to secure the woodwork.
The next step was to sheath the canoe inside with the small poles;
these were placed a few inches apart transversely and their ends worked
under the most inboard of the ribs on the stem-pieces, then held in
place, while the necessary adjustments were made, by a few temporary
ribs. Then the ribs were forced into place, one by one, each prebent to
the desired section, just as in birch-bark canoe construction. In this
final shaping, the skin cover might have to be wetted again to soften
the material and to allow stretching. The seams were then payed with
gum or tallow, and the canoe was ready for launching.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account