The Bark Canoes and Skin Boats of North AmericaChapelle, Howard Irving
History
The Bark Canoes and Skin Boats of North America
Chapelle, Howard Irving
Canoes and canoeing -- North America; Indians of North America -- Boats; Skin boats -- North America
The stem-piece is now placed between the folded bark end of the canoe
with the heel resting for a small distance along its length on the bark
bottom; the head must come to the right height above the outwales, as
noted. While one worker holds the stem-piece in place, another trims
away the excess bark at the end to the profile of the outboard face of
the stem-piece. Thus the profile of each end is cut and the rake of
the ends is established. The bark is next lashed to the stem-piece.
In this canoe it is done with a spiral over-and-over stitch, a batten
made of a large split root being placed over the edges of the bark, as
the lashing proceeds, to form a stem band. The turns pass alternately
from outboard around the inboard face of the stem-piece and through it;
the awl inserted in the laminations from one side opens them enough to
allow the strand to be forced through. Care is taken to pull up the
strand very hard each time. As the outwale is approached, the bark is
cut away at the notching in each so that the outwales can be brought
snugly against the sides of the stem-piece. Here the strand is brought
up one or two times over the outwales, abaft the stem head, before the
bitter end is tucked, thus locking the outwales to the stem-piece and
the bark. Then a lashing is placed around the outwales just inboard
of the stem-piece, passing through a hole in the flap of the end
deck-piece of bark and through the side bark. This lashing holds the
outboard end of the deck piece flap. At the inboard end of the flap,
another lashing is required, but the pinched-in outwales require
additional securing outboard of this point; hence a lashing is passed
just inboard of the middle of the flap, a little outboard of the ends
of the inwales, and about six inches inboard from this lashing another
is passed through the side bark and around the gunwale and outwale on
each side. These three lashings hold the outwales snug to the ends of
the gunwales and against the projecting bark ends in the pinched-in
form of projecting outwales.
[Illustration: Figure 43
RIBS BEING DRIED AND SHAPED FOR OJIBWAY CANOE. (_Canadian Geological
Survey photo._)]
The heels of the stem-pieces rest on the bottom bark and the sewing is
carried down to where the cutting of the profile makes an end to the
seam, the solid part of the heels extending about 6 to 8 inches inboard
of this. Next, any sewing required on the bottom is done. When the bark
cover has been given a final inspection on the outside and all sewing
has been completed, the canoe is lifted from its supports, righted, and
set on the bed or on a smooth grassy place.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account