Vietnam War, 1961-1975 -- Campaigns -- Vietnam -- Khe Sanh
The concept of operations entailed a two-battalion (2/3 and 3/3)
assault for which Hill 861 was designated Objective 1; Hill 881S was
Objective 2 and Hill 881N was Objective 3. From its position south of
Hill 861, 2/3 would assault and seize Objective 1 on 28 April. The 3d
Battalion would follow in trace of 2/3 and, after the first objective
was taken, 3/3 would wheel to the west, secure the terrain between
Hills 861 and 881S, then assault Objective 2 from a northeasterly
direction. Coordinated with the 3/3 attack, 2/3 would consolidate its
objective then move out toward Hill 881N to screen the right flank of
the 3d Battalion and reinforce if necessary. When Objectives 1 and 2
were secured, 3/3 would move to the northwest and support 2/3 while it
assaulted Objective 3. (See Map 5).
[Illustration:
MAP 5 K.W. White
CONCEPT OF OPERATIONS DURING HILL FIGHTS]
[Illustration: Marines of Company G, 2d Battalion, 3d Marines inch
their way toward the summit of Hill 881N during the Hill fights. (USMC
Photo A189161)]
[Illustration: Close air support strikes of the 1st Marine Aircraft
Wing and massive artillery fires paved the way for infantry assaults.
(USMC Photo A421953)]
After extremely heavy preparatory artillery fires and massive air
strikes, the 3d Marines kicked off the attack. On the 28th, 2/3
assaulted and seized Hill 861 in the face of sporadic resistance. Most
of the enemy troops had been literally blown from their positions by
heavy close air support strikes of the 1st Marine Aircraft Wing. The
operation continued with a thrust against Hill 881S by 3/3. This area
was the scene of extremely bitter fighting for several days, because,
by this time, the NVA regiment which was originally slated for the
attack on the airfield had been thrown into the hill battles in a vain
effort to stop the Marines. After tons of artillery shells and aerial
bombs had been employed against the hill, Lieutenant Colonel Wilder's
battalion bulled its way to the summit and, on 2 May, secured the
objective. In the meantime, Lieutenant Colonel De Long's battalion
pushed along the ridgeline leading from Hill 861 to 881N. After
smashing a determined NVA counterattack on 3 May, the 2d Battalion
battered its way to the crest of Hill 881N and secured the final
objective on the afternoon of the 5th. The three hills belonged to the
Marines.(11)
The supporting arms had done a good job, for the top of each hill
looked like the surface of the moon. The color of the summit had
changed from a vivid green to a dull, ugly brown. All of the lush
vegetation had been blasted away, leaving in its place a mass of
churned-up dirt and splintered trees. Hundreds of craters dotted the
landscape serving as mute witnesses to the terrible pounding that
the enemy had taken. What the NVA learned during the operation was
something the Marine Corps had espoused for years--that bombs and
shells were cheaper than blood.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account