The Beaver, Vol. 1, No. 05, February, 1921Hudson's Bay Company
History
The Beaver, Vol. 1, No. 05, February, 1921
Hudson's Bay Company
Canada -- History -- Periodicals; Canada, Northern -- History -- Periodicals; Hudson's Bay Company -- Periodicals
Her length was a hundred and one feet, breadth inside paddle boxes
twenty feet, outside thirty-three feet, depth eleven and one-half
feet, having one hundred and nine tons burden. She carried a crew of
twenty-six men and was armed with five nine-pounders. Her building, and
especially her launching, created a great interest, as she is reported
to have plunged into the mighty Thames under the patronage of royalty
and in the presence of a vast throng of spectators.
_H.B.C. Quality Shewn in Building_
The construction of the "Beaver" indicates that the Hudson's Bay
Company were up-to-date and were living up to their British traditions
by being always first in the field in any new enterprise that required
capital and far-sighted commercial methods. It must be remembered
that steam vessels were not at that time proven to be successful, but
were in the experimental stage. The spirit of adventure, as the term
was understood in those days, was much in evidence when the Company's
Governor and Committee ordered the "Beaver" in 1834 from Messrs. Green,
Wigham & Green, at Blackwall, London.
[Illustration: _The "Beaver" Riding at Anchor Near Victoria_]
Two new masts were made and installed at Port Simpson in 1858 by a
carpenter named Rudlin, and she was sent to Sitka, Alaska, to be
overhauled by the Russians the same winter (1858). Apart from this,
nothing seems to have been spent on her other than what her own crew
could do.
She had two engines 35 nominal horsepower, each of the long since
obsolete side-lever type, though much in favour during those early
times following the "Beaver's" construction.
It was an interesting day when the keel of this wonderful little black
steamer was laid, but how much more interesting must the 29th day of
August, 1835, have been when the "Beaver" glided down into the English
Channel and out on the trackless ocean on her voyage to the north
Pacific ocean to become famous in the annals of the west.
The "Beaver" arrived at Robinson Crusoe Island, via Cape Horn, December
17th, 1835, and Astoria (Columbia River) April 4th, 1836.
_H.B.C. Fur Headquarters on Columbia River_
The Hudson's Bay Company's fur trade up to this date had as its
headquarters on the Pacific Coast the Columbia River, but as the trade
was being developed it was soon apparent that Columbia River was not
the most suitable location from which to administer affairs. The ships
from London were taking great risks when crossing the Columbia River
bar, and as there were no steam tugs available, going up the Columbia
River with a sailing vessel for one hundred miles or more was not at
all to their liking. The coastwise boats, apart from the "Beaver," were
all small sailing-ships and the voyage to the Columbia from Puget Sound
was really a stupendous undertaking.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account