The binding of the Nile and the new SoudanPeel, Sidney Cornwallis
History
The binding of the Nile and the new Soudan
Peel, Sidney Cornwallis
Irrigation -- Egypt; Nile River; Sudan (Region)
And still the engineers were not satisfied. So treacherous is the
river’s bed that no possible safeguards seemed superfluous. It
speaks volumes for the courage and skill of those who in 1885 held
up 3 metres of water with the old unreformed Barrage, that in 1897,
after the successful execution of such great and costly repairs,
it was still thought advisable to undertake completely new works to
assist in the task of holding up 4, or at the most 5, metres.
It is a principle in hydraulics, not easily understood at first
by the layman, that the pressure upon a weir or barrage in a river
depends entirely upon the difference in level between the water on
the upstream and on the downstream side, and not on the mere volume
of water in the river behind it. In December, 1897, the Caisse de
la Dette voted £530,000 for the construction of two subsidiary
downstream weirs, with the object of relieving the pressure on the
Barrage by raising the level of the water on the downstream side, thus
dividing the head of water to be held up into two—in other words,
by making two steps instead of one. Each weir was to consist of a
core of rubble masonry set in cement, sunk well below the bed of the
river, and protected up and down stream by a long slope of rough stone
blocks or pitching. To make the masonry core thoroughly watertight,
a mass of clay puddle was to be put on either side of it. The weirs
were thus to be a solid dam, blocking the course of the stream up to
such a height that the head of water on the Barrage, at that time
amounting to 4 metres, would be reduced to 2·5 metres. The flood
would pass freely over the top of the weirs. At the same time the
sluice-gates of the existing Barrage were to be heightened, so as to
permit the upstream level to be raised 1 metre more in June and July,
so as to take full advantage of the rising flood and facilitate the
early sowing of maize, a great point with the Egyptian cultivator.
By the summer of 1900 this programme had been completed. The building
of the weir on the Rosetta branch was an especially fine performance,
for which great credit was due to Sir Hanbury Brown and Mr. Brooke,
who were in charge of it. Five hundred metres in length, it was begun
at the end of December, 1899, and actually finished before the flood
began to come down in July. The same Portland cement played a great
part in its construction. It may now fairly be said that the Barrage
is complete at last, and fully equal to every strain that it can be
called upon to bear.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account