The boy's book of trades and the tools used in them — John Shaqi
The boy's book of trades and the tools used in themAnonymous
General
The boy's book of trades and the tools used in them
Anonymous
Industrial arts -- Juvenile literature; Vocational guidance -- Juvenile literature
The excavator having dug out the space where the foundation of the house
is to be laid, the work of the bricklayer begins, and his tools are the
_trowel_, to take up and spread the mortar, and cut bricks by a sharp
blow to the requisite length; then there are the _brick axe_ or hammer,
for shaping the bricks to a level; the _tin saw_ for making an incision
on bricks to be cut with the axe; the rubbing stone on which to rub the
bricks smooth in the parts where they have been cut, and the _mortar rake
and shovel_, for mixing the mortar and cement.
[Illustration: Mortar Rake. Crowbar. Shovel. Brick Hammer. Pickaxe.]
The crowbar and pick-axe are the tools used for demolishing old brickwork
or clearing out rubbish; the sieve (_see large cut_) for sifting the lime
of which the mortar is made, and the rammer for hardening the ground to
render the foundation firm. The _raker_ is used for raking out the mortar
from the joints of old brickwork which requires re-pointing, or the
joints refilled with mortar.
To “set out” the work, which means to measure the spaces, and to keep
the lines, curves, and angles, straight and true, the bricklayer uses
the _square_, the _level_, the _plumb-rule_; the square shows whether
the proper angle has been preserved; the plumb-rule is an upright rule,
with a string at one end, to which is attached a leaden ball. If the
work is straight on its perpendicular lines, and the plumb-rule be
applied to it, this leaden ball will hang exactly in the centre, and
swing through a hole in the rule, while, if the work be crooked, it will
swing to one side. The level is a rule on the same principle, but for
testing horizontal lines, such as a cornice on the top of a wall. The
good bricklayer will frequently test his work by these tools, and will
also use a line stretched to two pins, to guide him as he builds up his
courses of bricks.
The bricks and mortar are supplied to him by a labourer, who carries
them in a _hod_. The labourer also makes the mortar, and builds up and
takes down the _scaffolding_ (_see large cut_). The scaffolding, or that
frame of poles and planks erected in front of the building as it is in
progress, is constructed of _standards_, _ledgers_, and _putlogs_.
The standards are poles made of fir trees, from forty to fifty feet long,
and six or seven inches thick at the butt ends, which are firmly fixed in
the ground. When one pole is not long enough, two are lashed together,
the rope lashings being tightened by wedges driven in between the coils
in a peculiar way. The ledgers are horizontal poles placed parallel to
the walls and lashed to the standards; these support the putlogs, or
cross pieces, which are about six feet long, one end of them resting in
the wall, the other on the ledgers. On these putlogs are fastened the
scaffold boards, which are stout boards with pieces of iron hoop placed
round the ends, to keep them from splitting.
[Illustration: Level. Cutting Chisel. Square. Line and Plumb. Hod.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account