The Cathedral Church of Canterbury [2nd ed.]: A Description of Its Fabric and a Brief History of the Archiepiscopal SeeWithers, Hartley
History
The Cathedral Church of Canterbury [2nd ed.]: A Description of Its Fabric and a Brief History of the Archiepiscopal See
Withers, Hartley
Canterbury Cathedral
the importance of their monastery," and moreover wanted shrine-room for
the display of relics. The main body of Lanfranc's church was left
standing, and is described as follows by Gervase. "The tower, raised upon
great pillars, is placed in the midst of the church, like the centre in
the middle of a circle. It had on its apex a gilt cherub. On the west of
the tower is the nave of the church, supported on either side upon eight
pillars. Two lofty towers with gilded pinnacles terminate this nave or
aula. A gilded _corona_ hangs in the midst of the church. A screen with a
loft (_pulpitum_) separated in a manner the aforesaid tower from the nave,
and had in the middle and on the side towards the nave, the altar of the
holy cross. Above the _pulpitum_ and placed across the church, was the
beam, which sustained a great cross, two cherubim, and the images of St.
Mary and St. John the Apostle.... The great tower had a cross from each
side, to wit, a south cross and a north cross, each of which had in the
midst a strong pillar; this pillar sustained a vault which proceeded from
the walls on three of its sides," etc. Prof. Willis considers that as far
as these parts of the building are concerned, the present fabric stands
exactly on the site of Lanfranc's. "In the existing building," he says,
"it happens that the nave and transepts have been transformed into the
Perpendicular style of the fourteenth century, and the central tower
carried up to about double its original altitude in the same style.
Nevertheless indications may be detected that these changed parts stand
upon the old foundations of Lanfranc."
The building, however, was not destined to remain long intact. In A.D.
1174 the whole of Conrad's choir was destroyed by a fire, which was
described fully by Gervase, a monk who witnessed it. He gives an
extraordinary account of the rage and grief of the people at the sight of
the burning cathedral. The work of rebuilding was immediately set on foot.
In September, 1174, one William of Sens, undertook the task, and wrought
thereat until 1178, when he was disabled by an unfortunate fall from a
scaffolding, and had to give up his charge and return to France. Another
William, an Englishman this time, took up the direction of the work,
and under his supervision the choir and eastern portion of the church
were finished in A.D. 1184. Further alterations were made under Prior
Chillenden at the end of the fourteenth century. Lanfranc's nave was
pulled down, and a new nave and transepts were constructed, leaving but
little of the original building set up by the first Norman archbishop.
Finally, about A.D. 1495, the cathedral was completed by the addition of
the great central tower.
[Illustration: PLAN OF CANTERBURY CATHEDRAL, ABOUT A.D. 1165.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account