It was very soon realised that nothing short of rebuilding the tower
from the foundation would meet the case. The first stone was taken down
on April 5th, and the tower and two eastern piers were removed by
August. The western piers were soon afterwards condemned, and taken down
the following year. The chief corner stone of the new tower at the
north-eastern pier, was laid with full masonic ceremonial on May 7th
1884, by the Earl of Carnarvon, acting for the Prince of Wales. All the
stones, as taken down, were numbered, and every one that could be used
again was replaced in its original position. During this year there
commenced a controversy as to the correct way of finishing the building
of the tower. When the Decorated lantern was first built, the great
arches, east and west, to the choir and nave, were altered from the
round to the pointed shape. A few of the stones of the original Norman
arches having been brought to light during the work, some persons wished
round arches to be built as at first. Some stones of the Norman tower
were also found; and it was proposed to heighten the central tower by
one stage of work in the Norman style, using original stones where
possible, and placing the Decorated stage above it. Others again, wanted
a lofty central spire to be added. The matter was referred to Archbishop
Benson for his decision. In the result the whole was rebuilt exactly as
before, with the exception that the four corner turrets, erected by Dean
Kipling, were not replaced.
In 1886 the tower was finished. The transept ceilings were repaired in
this and the next year. All unsound wood was removed and replaced by
good oak. The diamond shapes are still to be seen, but the black, white,
and brown patterns have been improved away. The discovery of the site of
the Saxon church, which will be described hereafter, was made in 1883.
Steady progress continued to be made in securing the safety of various
parts of the church; and on July 11th, 1889, a temporary choir having
been fitted up, divine service was again held in the ancient ritual
choir, which extended two bays into the nave.
During the next two years many contributors to the general fund for the
restoration, and some others, made gifts of special objects for the
embellishment of the choir. By the end of May, 1892, the mosaic pavement
was almost completed, and the bishop's throne, the pulpit, the litany
desk, and eighteen stalls had been erected. These gifts were solemnly
dedicated at a stately service held on June 2nd, when, after the litany
and an anthem, the special service was taken by the Archbishop of
Canterbury at the altar, and after that _Te Deum_ was sung. A sermon was
preached by the Bishop of Durham, formerly Canon. The Archbishop and
Bishops wore their convocation robes.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account