The Cathedral Church of Peterborough: A Description Of Its Fabric And A Brief History Of The Episcopal SeeSweeting, W. D. (Walter Debenham)
History
The Cathedral Church of Peterborough: A Description Of Its Fabric And A Brief History Of The Episcopal See
Sweeting, W. D. (Walter Debenham)
Peterborough Cathedral
Hardly a year passed
without something falling down; sometimes a piece of a pinnacle,
sometimes a crocket or other ornament, sometimes a shaft. Old engravings
of the spires show the pinnacles broken. Many of the shafts are wanting.
Some have been replaced in wood. Many wholly new ones were put up by
Dean Monk. And concerning the north arch, which was notoriously the most
dangerous, Dean Patrick has recorded that Bishop Laney gave £100 toward
the repairing one of the great arches of the church porch "which was
faln down in the late times." Dean Monk also, in a memoir of his
predecessor Dean Duport,[19] speaks of the efforts of the cathedral body
to repair the devastation caused by the civil war, and says "in
particular one of the three large arches of the West Front, the beauty
of which is acknowledged to be without rival, having fallen down, it was
restored in all its original magnificence." In an account of the
cathedral published by the writer thirty years ago, he says of this
arch: "Its present state looks dangerous from below. The stones in the
arch have some sad gaps. It is tied up by iron bands, and further
protected within by a great number of wooden pegs, not of recent
construction. When last observed it leant forward 14½ inches." In 1893
he wrote: "there is no doubt that the security of the whole front is a
most serious question that before long must demand energetic action."
[Illustration: Finial of the Central Gable of the West Front.]
A very great preponderance of local opinion was in favour of the action
of the Dean and Chapter. When it came to moving the stones, after all
the rubbish was removed, it was found that the mortar had crumbled into
mere dust, and could be swept away; and that the stones themselves could
be lifted from their positions, without the use of any tool. What has
actually been done is this: the north gable has been taken down with the
outer orders of the archivolt for a depth of some feet, and rebuilt; the
innermost order has not been moved. Relieving arches have been put in at
the back. The gable is now believed to be perfectly secure. The cross on
the summit was replaced in its position on July 2nd, 1897. The south
gable was afterwards taken down and rebuilt, a very few new stones being
used to bond the masonry where a fracture had been found on the left
side of the great arch below. This is what has been called "the
destruction" of the west front.
CHAPTER II.
THE CATHEDRAL--EXTERIOR.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account