The girders carrying the upper flights spring from the landing girders, and
have their upper ends bolted on to the main girders supporting the
galleries, which are varied in pattern for this purpose. The railing of the
staircase is formed in separate cast-iron standards, one to each step,
which are bolted on to the top flange of the girders; and the foot of the
standard is so continued that the ends of the treads are fitted into it,
and are thus supported. The pattern of these standards is assimilated to
that of the gallery railing.
The hand-rail is formed of Honduras mahogany, with carved ends. On each
side of the upper flight, which occupies the centre of a 24-feet space,
connecting-galleries about eight feet wide are carried, establishing a
communication between the two lines of gallery without descending to the
level of the landing and then re-ascending. The landing is sufficiently
high above the ground-floor to give ample headway for passing underneath
it; so that the space occupied by the staircases on the ground-floor is but
small.
The Floor and Foundations.
It now only remains to mention briefly the construction of the floor of the
building, and the foundations for the base-pieces. The substratum of the
site consists of gravel of an excellent quality, and sufficiently dense to
have sustained, perhaps without any preparation, the load brought upon it
by the bases of the columns. A thickness of concrete, proportioned in all
cases to the amount of the weight to be borne by the superincumbent
columns, and of such a size as to be two feet in each direction larger than
the bed-plates, was placed upon the gravel, and the upper surface was
finished with a bed of fine mortar to receive the bed-plates. In this
manner it was calculated that in no case would a greater weight than
two-and-a-half tons be borne by each foot superficial of the
gravel--previous experiments having shown that a considerably larger weight
could be placed upon it without any injurious effect.
The timbers supporting the joists for the floor are also placed upon small
blocks of concrete, about one foot cube, at a distance of eight feet apart.
On these are fixed the flooring-joists, and a deal floor an inch and a half
thick is laid on them, as has been already mentioned, with intervals of
about half an inch between the boards.
[Illustration: FIXING CAST-IRON DRAIN-PIPE.]
In order to carry off the water brought down from the roof by every
alternate longitudinal row of columns, 6-inch cast-iron pipes are fitted
into the sockets described in the base-pieces, and are carried in the lines
of those columns through the whole length of the building, with discharges
into the larger drains at the centre and at each end; the natural slope of
the ground gives a sufficient fall to the pipes.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account