In replacing the covering of stone, it was found best to lay it on in
layers of about three inches thick, admitting the travel for a short
interval on each layer, and interposing such obstructions from time to
time as would insure an equal travel over every portion of the road;
care being taken to keep persons in constant attendance to rake the
surface when it became uneven by the action of wheels of carriages. In
those parts of the road, if any, where materials of good quality could
not be obtained for the road in sufficient quantity to afford a course
of six inches, new stone was procured to make up the deficiency to that
thickness; but it was considered unnecessary, in any part, to put on a
covering of more than nine inches. None but limestone, flint, or granite
were used for the covering, if practicable; and no covering was placed
upon the bed of the road till it had become well compacted and
thoroughly dried. At proper intervals, on the slopes of hills, drains
or paved catch-waters were made across the road, whenever the cost of
constructing culverts rendered their use inexpedient. These catch-waters
were made with a gradual curvature, so as to give no jolts to the wheels
of carriages passing over them; but whenever the expense justified the
introduction of culverts, they were used in preference, and in all cases
where the water crossed the road, either in catch-waters or through
culverts, sufficient pavements and overfalls were constructed to provide
against the possibility of the road or banks being washed away by it.
The masonry of the bridges, culverts, and side-walls was ordered to be
repaired, whenever required, in a substantial manner, and care was taken
that the mortar used was of good quality, without admixture of raw clay.
All the masonry was well pointed with hydraulic mortar, and in no case
was the pointing allowed to be put on after the middle of October. All
masonry finished after this time was well covered, and pointed early in
the spring. Care was taken, also, to provide means for carrying off the
water from the bases of walls, to prevent the action of frost on their
foundations; and it was considered highly important that all foundations
in masonry should be well pointed with hydraulic mortar to a depth of
eighteen inches below the surface of the ground.
By the year 1818, travel over the first great road across the Allegheny
Mountains into the Ohio Basin had begun.
CHAPTER II
BUILDING THE ROAD IN THE WEST
The tales of those who knew the road in the West and those who knew it
in the East are much alike. It is probable that there was one important
distinction--the passenger traffic of the road between the Potomac and
Ohio, which gave life on that portion of the road a peculiar flavor, was
doubtless not equaled on the western division.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account