"The trees and growth to be entirely cleared away to the distance of 40
feet on each side of the central axis of the road, and all trees
impending over that space to be cut down; all stumps and roots to be
carefully grubbed out to the distance of 20 feet on each side of the
axis, and where occasional high embankments, or spacious side drains may
be required, the grubbing is to extend to the distance of 30 feet on
each side of the same axis. All the timber, brush, stumps and roots to
be entirely removed from the above space of 80 feet in width and the
earth excavated in grubbing, to be thrown back into the hollows formed
by removing the stumps and roots.
"The proposals will state the price per linear rod or mile, and the
offers of competent, or responsible individuals only will be accepted.
"Notice is hereby given to the proprietors of the land, on that part of
the line of the National Road lying between Springfield and the Miami
river, to remove all fences and other barriers now across the line a
reasonable time being allowed them to secure that portion of their
present crops which may lie upon the location of the road.
G. DUTTON,
_Lieutenant U. S. Engineers Supt._
National Road Office, Springfield, Ohio.
August 2nd 1837."[13]
Indianapolis was the center of Cumberland Road operations in Indiana,
and from that city the road was built both eastward and westward. The
road entered Indiana through Wayne County but was not completed until
taken under a charter from the state by the Wayne County Turnpike
Company, and finished in 1850. When Indiana and Illinois received the
road from the national Government it was not completed, though graded
and bridged as far west as Vandalia, then the capital of Illinois.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account