Thousands upon thousands of dollars are being telegraphed here hourly,
yes, every minute, for the relief of the bereaved. New York has come to
the front nobly with over $200,000, and Brooklyn, Philadelphia, Chicago
and other cities, and, indeed, nearly every town and village in the
country has sent its quota of relief funds.
A word should be said right here regarding the cause of the disaster.
The South Fork Fishing Club is held chiefly responsible. The broken
dam shows that it was simply a pile of dirt and rubble dumped across a
stream between two hills that formed the banks of the reservoir. When
the water began to break through this dam everything had to give way,
causing a torrent sixty feet high to rush onward toward the doomed
valley.
[Illustration: DOWN WITH THE TIDE.]
The dam was built many years ago to create a reservoir for use as a
feeder to the Pennsylvania Canal. The builders placed in the forty-foot
space at the bottom, where the creek ran, five huge pipes, each as
large as a hogshead. These were covered by an arch of massive masonry,
and were arranged to be opened or closed by levers in a tower that was
built in the centre of the dam.
These five big pipes were calculated to be large enough to carry off
all surplus water that could ever be poured into the lake above and
which could not escape by the regular exit, which was a sluiceway
around one corner of the dam at a level of eight or ten feet below the
top. This sluiceway was really a new stream, the water passing off
through it finding its picturesquely winding course down the hillside
and running with the stream again some distance below the dam. The
sluiceway and waste gates never failed to do the work for which they
were designed, and there is no reason to suppose that they would have
failed to do so at the present time and for the future had they been
maintained as the builders contemplated.
When the Pennsylvania Canal was abandoned the dam became useless, and
was neglected. The tower in which the machinery managing the waste
gates is located is said to have fallen into ruin a few years ago.
The lake was then leased by the Pittsburgh Sportsman’s Association.
Engineer Fulton, of the Cambria Iron Company made an inspection of it
and pronounced it dangerous. The Association set out, they declared, to
improve and strengthen it.
They did cut off two feet from the top of the dam, and may have
strengthened it in some respects; but either because the waste gates
were so damaged that to repair them would have been an expensive job,
or, for the other reason mentioned, that the fish would escape by the
waste gates, everyone who lives near says the gates were permanently
stopped up. The present appearance of the wreck of the dam indicates
the truthfulness of the story. There are remnants of the waste gate
masonry, but there is no indication that they have been of any
practical use for a long time.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account