The Engineering Contributions of Wendel BollmanVogel, Robert M.
History
The Engineering Contributions of Wendel Bollman
Vogel, Robert M.
Bollman, W. (Wendel), 1814-1884; Iron and steel bridges -- History
Bollman's separation from the B. & O. was not a complete one. The
railroad continued its program of replacing timber bridges with Bollman
trusses, and contracted with W. Bollman and Company for design and a
certain amount of fabrication. There is some likelihood that eventually
fabrication was entirely discontinued at Mount Clair, and all parts
subsequently purchased from Bollman.
The firm prospered, erecting a number of major railroad bridges in
Mexico, Cuba, and Chile. Operations ceased from 1861 to 1863 because of
difficult wartime conditions in the border city of Baltimore. Following
this, Bollman reentered business as sole proprietor of the Patapsco
Bridge and Iron Works.
[Illustration: QUINCY BAY BRIDGE
Figure 17.--CHICAGO, BURLINGTON AND QUINCY RAILROAD BRIDGE over Quincy
Bay (branch of the Mississippi River) at Quincy, Illinois. The pivot
draw-span was formed of two Bollman deck trusses supported at their
outer ends by hog chains. The bridge was built in 1867-1868 by the
Detroit Bridge and Iron Co., Bollman licensee. (Clarke, _Account of the
Iron Railway Bridge ... at Quincy, Illinois_.)]
The most noteworthy of Bollman's works in this period was a series of
spans at Harpers Ferry. The B. & O.'s timber bridge had been destroyed
by Confederate forces in June 1861, and the crossing was thereafter made
upon temporary trestlework. This was a constant source of trouble, with
continuing interruptions of the connection from high water, washouts,
and military actions. The annoyance and expense of this became so great
that the company decided to risk an iron bridge at the crossing. In July
and August 1862, two sections of Bollman truss, spans no. 4 and no. 5
were completed. As this occurred during the time when W. Bollman and
Company was inoperative, the work was produced at Mount Clair to
Bollman's design and, undoubtedly, erected under his supervision. Five
weeks later, on September 24, these and Bollman's famous Winchester span
of 1851 were blown up by the Confederates, and the line's business was
again placed at the mercy of trestling.
The spirit of the B. & O. administration indeed seems to have been
unshakable when, in the face of such heartbreaking setbacks, it
determined to again bridge the river with iron, even at the height of
the hostilities. In November, span no. 5 was erected, and by April 1863
nos. 3, 4, and 6 also. These were the four straight spans in midriver
between the "wide" (or "branch," or "wye") span and the span on the
Maryland shore over the Chesapeake and Ohio Canal (see fig. 13).
Although the wood floor system of these spans was burned for strategic
reasons by U.S. troops later in 1863, they survived the war.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account