The Every-day Book and Table Book. v. 3 (of 3): Everlasting Calerdar of Popular Amusements, Sports, Pastimes, Ceremonies, Manners, Customs and Events, Incident to Each of the Three Hundred and Sixty-five Days, in past and Present Times; Forming a Complete History of the Year, Month, and Seasons, and a Perpetual Key to the AlmanacHone, William
History
The Every-day Book and Table Book. v. 3 (of 3): Everlasting Calerdar of Popular Amusements, Sports, Pastimes, Ceremonies, Manners, Customs and Events, Incident to Each of the Three Hundred and Sixty-five Days, in past and Present Times; Forming a Complete History of the Year, Month, and Seasons, and a Perpetual Key to the Almanac
Hone, William
Days; Great Britain -- Social life and customs
In a parliament held at Carlile, in 35 Edward I., 1307, Henry Lacy earl
of Lincoln complained that, in former times, the course of water running
under Holborn-bridge and Fleet-bridge into the Thames, had been of such
breadth and depth that ten or twelve ships at once, “navies with
merchandise,” were wont to come to Fleet-bridge, and some of them to
Holborn-bridge; yet that, by filth of the tanners and others, and by
raising of wharfs, and especially by a diversion of the water in the
first year of king John, 1200, by them of the New Temple, for their
mills without Baynard’s Castle, and by other impediments, the course was
decayed, and ships could not enter as they were used. On the prayer of
the earl, the constable of the Tower, with the mayor and sheriffs of
London, were directed to take with them honest and discreet men to
inquire into the former state of the river, to leave nothing that might
hurt or stop it, and to restore it to its wonted condition. Upon this,
the river was cleansed, the mills were removed, and other means taken
for the preservation of the course; but it was not brought to its old
depth and breadth, and therefore it was no longer termed a river, but a
brook, called Turne-mill or Tremill Brook, because mills were erected on
it.
After this, it was cleansed several times; and particularly in 1502, the
whole course of Fleet Dike, as it was then called, was scoured down to
the Thames, so that boats with fish and fuel were rowed to Fleet-bridge
and Holborn-bridge.
In 1589, by authority of the common council of London, a thousand marks
were collected to draw several of the springs at Hampstead-heath into
one head, for the service of the City with fresh water where wanted, and
in order that by such “a follower,” as it was termed, the channel of the
brook should be scoured into the Thames. After much money spent, the
effect was not obtained, and in Stow’s time, by means of continual
encroachments on the banks, and the throwing of soil into the stream, it
became worse clogged than ever.[24]
After the Fire of London, the channel was made navigable for barges to
come up, by the assistance of the tide from the Thames, as far as
Holborn-bridge, where the Fleet, otherwise Turnmill-brook, fell into
this, the wider channel; which had sides built of stone and brick, with
warehouses on each side, running under the street, and used for the
laying in of coals, and other commodities. This channel had five feet
water, at the lowest tide, at Holborn-bridge, the wharfs on each side
the channel were thirty feet broad, and rails of oak were placed along
the sides of the ditch to prevent people from falling into it at night.
There were four bridges of Portland stone over it; namely, at Bridewell,
Fleet-street, Fleet-lane, and Holborn.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account