Methods of well drilling differ in various regions in accordance with
the special problems to be encountered and perhaps no other industry
furnishes more examples of mechanical ingenuity in the solution of
physical difficulties. Drake went about the business of drilling
the first well by using the traditional methods of boring for salt.
Improvement was inevitable, however, and the Canadian wells of Western
Ontario, which came into existence almost contemporaneously with those
of Pennsylvania, were fruitful of inventions which have influenced
drilling practices in many parts of the world. If we go back to the
origins of oil and salt drilling mechanisms we find ourselves in China
centuries before the Christian era. The Chinese used an auger attached
to a pole that was held in a vertical position from a cross pole
supported on a post. The end of the cross pole was fastened to a lever
while a driller guided the cable to which an auger or boring tool was
attached. Several coolies jumped from a platform on to the reverse side
of the board, so that the tool would be jerked up and would plunge
down and thus deepen the hole with each stroke. The deeper the hole
became, the more coolies required for the task of “kicking down.”
Jumpers were not a part of the staff of an oil-drilling organization
in America in the early days but foot power was sometimes employed for
the same purpose of driving the drilling tools into the ground. To-day
labour-saving machinery plays as great a part in well drilling as in
other branches of industry.
Let us suppose then that an oil company, or an individual with the
requisite capital at his back, has advanced through the preliminaries
which must precede drilling operations; the geologists have made a
favourable declaration as to the prospective site; the leases and
royalties have been arranged and the title is secure. When it is
decided to start drilling, roads are built, water lines laid, and the
lumber, casing machinery and other equipment are hauled to the location
(often under very primitive and difficult conditions). The apparatus
most commonly installed under these circumstances is the Pennsylvania
cable system, which consists of a standard derrick or rig, built
of wood or steel, about eighty feet in height, having a twenty-foot
base and a four-foot top. The strength of the derrick is conditioned
entirely by the size and depth of the well the operator wishes to
drill, for nowadays nothing is left to chance. The size of the hole
necessary in starting a well depends upon the physical formation. If
it is soft, it is necessary to start with a hole of large diameter, to
overcome the disabilities produced by caving. It sometimes happens that
soft formations cave so much that it is necessary to insert several
columns of casing before the required depth is reached. A hole with a
large diameter is also used in deep drilling.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account