Less than a year afterward nitro-glycerine was being exploded in large
quantities down deep in the earth to shatter the oil-bearing rock and
make wells flow, without noticeable public or physical disturbance.
Any one who has watched farmers blow up tree stumps with dynamite may
imagine what effect eighty quarts of nitro-glycerine would produce
at the bottom of a deep eight-inch well. The “oil-shooters” are
necessarily men of steady nerve and extreme caution. A shot will vary
from ten quarts to as much as three hundred quarts, as the well to be
treated may seem to require. For this purpose the nitro-glycerine is
contained in tin tubes or shells five feet long and two inches or more
in diameter, pointed at the lower end and having bail handles at the
top. From five to fifteen shells, as the case may be, are lowered into
the hole with extreme delicacy, and then the “go-devil”--a five-pound
pointed shell--is released point downward. Nowadays, it is customary
to use a nitro-glycerine squib wound with a long fuse more often
than a “go-devil,” since the lowering of the cans of explosives may
loosen earth which forms a cushion above the shells. An example of the
presence of mind of a well shooter was provided a few years ago. Just
after the first shell had been lowered, the rope suddenly slackened.
This could only mean that the well had unexpectedly begun to flow and
that in the space of a few seconds the shell containing six quarts of
deadly explosive would be hurled from the well mouth. There was no time
to run and the only thing that could be done this “well shooter” did.
Bracing himself directly over the well he grasped the shell as it came
to the surface, and although the impetus with which it had ascended
threw him across the derrick and dislocated his shoulder, he held it
free from contact and saved the lives of the entire crew.
Under the careful arrangements now made, a well is controlled with no
more loss of oil than the driller thinks necessary to flush out the
dirt and debris caused by the explosion.
The early or flush production of a well is usually of considerably
greater volume than its normal or settled flow after it has been in
operation for a few weeks. This decline in production is often as much
as 50% in the first 30 days. Where wells do not flow naturally, various
devices can be used to stimulate the output. Gas pressure has much to
do with the problem. As a general rule the well of low gas pressure
must be pumped from the beginning. The “gusher” which is the result
of high gas pressure usually recedes rapidly in the matter of flow
and becomes what is known as a “pumper,” the name given to wells when
pumping is resorted to.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account