The crude is pumped into small flow tanks, and from there run either to
a pipe line station or to a “tank farm.” The problem of saving the flow
of gushing wells at one time presented serious difficulties; and one
of the most valuable of the early inventions was the clay underground
tank. The petroleum is directed into a sump-hole lined (wherever
possible) with clay, which, because of its close texture, makes an
absolutely leakage proof reservoir. From the sump-hole it is pumped
to the tanks, but this is usually but a temporary shift. When the
gushing process ceases, pumps are installed and direct pipe connection
with the storage tanks is established. The modern pump which lifts
the oil from the oil-bearing strata to the surface is a very powerful
mechanism. One of these will handle a column of oil as high as four
thousand feet, and deliver it into pipes. As has been mentioned in
alluding to the California seacoast fields, the intervening ocean
itself constitutes no obstacle to operations. Not infrequently the
walking beam, used in the drilling, is brought into commission for
pumping purposes. It is rather a cumbersome system but has this
advantage, that it enables the operator to begin production immediately
and realize cash for his output.
In what is known as the field tank, situated adjacent to the derricks
and pumps, the oil operator deposits his daily production, which is
later pumped to the “tank farm” for shipment. The capacity of a tank
is known to a gallon. So many inches or feet of petroleum in a tank
represent so many barrels. The gauger drops a steel tape into the oil
until it touches bottom, and the location of the oil showing on this
steel is the measure of the contents. Then the valves are opened and
a portion of the contents flows away to the pump station or “tank
farm.” A second measurement is taken, and the difference between the
first and second measurement reveals the quantity of oil drawn off. The
gauger then issues to the producer a credit certificate or “run ticket”
representing the quantity of the crude received at that particular time.
There are other complications, however, before the oil reaches the
market. If the wells are gaseous in any considerable degree, the oil
must pass through a gas separator before it enters the tanks. The
gauger must measure and draw off any water present, which, owing to the
proverbial incompatability of oil and water, is not difficult, and in
calculating the amount of the credit slip he sees to it that no water
is inadvertently paid for.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account