When two pumpings are required they are frequently done, especially in
the smaller places, in the same pumping-station, with but one set of
boilers and engines, the two pumps being connected to the same engine.
The cost is said to be only slightly greater than that of a single
lift of the same total height. In very large works, as at Berlin and
Hamburg and some of the London companies, two separate sets of pumping
machinery involve less extra cost relatively than would be the case
with smaller works.
SEDIMENTATION-BASINS.
Kirkwood[2] found in 1866 that sedimentation-basins were essential
to the successful treatment of turbid river-waters, and subsequent
experience has not in any way shaken his conclusion. The German works
visited by him, Berlin (Stralau) and Altona, were both built by English
engineers, and their settling-basins did not differ materially from
those of corresponding works in England. Since that time, however,
there has been a well-marked tendency on the part of the German
engineers to use smaller, while the English engineers have used much
larger sedimentation-basins, so that the practices of the two countries
are now widely separated, the difference no doubt being in part at
least due to local causes.
Kirkwood found sedimentation-basins at Altona with a capacity of
2-1/4 times the daily supply. In 1894 the same basins were in use,
although the filtering area had been increased from 0.82 acre to 2.20
acres, and still more filters were in course of construction, and
the average daily quantity of water had increased from 600,000 to
4,150,000 gallons in 1891-2, or more than three times the capacity of
the sedimentation-basins. In 1890 the depth of mud deposited in these
basins was reported to be two feet deep in three months. At Stralau in
Berlin, also, in the same time the filtering area was nearly doubled
without increasing the size of the sedimentation-basins, but the Spree
at this point has such a slow current that it forms itself a natural
sedimentation-basin. At Magdeburg on the Elbe works were built in 1876
with a filtering area of 1.92 acres, and a sedimentation-basin capacity
of 11,300,000 gallons, but in 1894 half of the latter had been built
over into filters, which with two other filters gave a total filtering
surface of 3.90 acres, with a sedimentation-basin capacity of only
5,650,000 gallons. The daily quantity of water pumped for 1891-2 was
5,000,000 gallons, so that the present sedimentation-basin capacity is
about equal to one day’s supply, or relatively less than a third of the
original provision. The idea followed is that most of the particles
which will settle at all will do so within twenty-four hours, and that
a greater storage capacity may allow the growth of algæ, and that the
water may deteriorate rather than improve in larger tanks.
[Illustration: PAVED EMBANKMENT BETWEEN TWO FILTERS, EAST LONDON.]
[Illustration: FILTERS AND CHANNELS FOR RAW WATER, ANTWERP.]
[_To face page 10._]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account