The History of Louisville, from the Earliest Settlement till the Year 1852Casseday, Ben
History
The History of Louisville, from the Earliest Settlement till the Year 1852
Casseday, Ben
Louisville (Ky.) -- Description and travel; Louisville (Ky.) -- History
On the 12th of January, in this year, the Louisville & Portland Canal
Company was incorporated by an act of the Legislature, with a capital of
$600,000, in shares of $100 each, with perpetual succession. 3665 of these
shares were in the hands of about 70 individuals, residing in different
States, and the remaining 2335 shares belonged to the government of the
United States. In December contracts were entered into to complete the
work of the canal within two years for about $375,000, and the work was
actually commenced in March 1826. Many unforeseen difficulties retarded it
until the close of the year 1828. At this time the contractors failed, new
contracts were made at advanced prices, and the canal was finally opened
for navigation, December 5th, 1830. When completed, it cost about
$750,000. It is about two miles in length and is intended to overcome a
fall of twenty-four feet, occasioned by an irregular ledge of lime-stone
rock, through which the entire bed of the canal is excavated, a part to
the depth of 12 feet, overlaid with earth. There is one guard and three
lift locks combined, all of which have their foundation on the rock. One
bridge of stone 240 feet long, with an elevation of 68 feet to the top of
the parapet wall, and three arches, the centre one of which is
semi-elliptical, with a transverse diameter of 66, and a semi-conjugate
diameter of 22 feet. The two arches are segments of 40 feet span. The
guard lock is 190 feet long in the clear, with semi-circular heads of 26
feet in diameter, 50 feet wide and 42 feet high, and contains 21,775
perches of mason work. The solid contents of this lock are equal to 15
common locks, such as are built on the Ohio and New York canals. The lift
locks are of the same width with the guard lock, 20 feet high and 183 feet
long in the clear, and contain 12,300 perches of mason work. The entire
length of the walls from the head of the guard lock to the end of the
outlet lock is 921 feet. In addition to the amount of mason work above,
there are three culverts to drain off the water from the adjacent lands,
the mason work of which, when added to the locks and bridge, gives the
whole amount of mason work 41,989 perches, equal to about 30 common canal
locks. The cross section of the canal is 200 feet at top of banks, 50 feet
at bottom and 42 feet high, having a capacity equal to that of 25 common
canals; and if we keep in view the unequal quantity of mason work,
compared to the length of the canal, the great difficulties of excavating
earth and rock from so great a depth and width, together with the
contingencies attending its construction from the fluctuations of the Ohio
river, it may not be considered as extravagant in drawing the comparison
between the work in this, and in that of 70 or 75 miles of common
canaling.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account