It was in consequence necessary to institute a system of artillery
retaliation, by which a certain number of rounds were fired back at the
enemy by howitzers for every trench-mortar round he fired. Howitzers of
various calibres up to 6-inch as well as the field-guns took part in
these retaliatory shoots, according to the ammunition supply. As this
became more liberal, this system tended to check the enemy's
trench-mortar activity, particularly when, by careful observation, the
positions of his trench-mortar emplacements were located, and the
retaliation was brought to bear actually on the offending mortars.
The enemy could, however, bombard certain sections of trenches so
systematically that he was able to obliterate them. This was
particularly the case opposite La Boisselle and in an area known as the
Salient. The latter received so much attention as to become untenable,
and on 1st December it was evacuated, a retrenchment being dug and
occupied behind it.
During these trench-mortar bombardments, it had been discovered that
the French shelters, having only three or four feet of cover, were not
shell-proof. They were, in fact, death-traps, as they gave the men a
false sense of security. In consequence, during a bombardment men would
crowd into them to take cover, and should a trench-mortar bomb then
strike one of them, it was blown in and all its occupants were killed.
On 21st October it was therefore decided to provide fresh dug-out
accommodation for the whole garrison. The tunnelling company, as has
been explained, was strained to its utmost to keep pace with the mining
situation. The construction of the dug-outs was therefore entrusted to
the 8th Royal Scots, who had joined the Division as the Divisional
Pioneer Battalion on 25th August 1915. Fresh calls were made on the
infantry for skilled miners, who were attached to the 8th Royal Scots.
Work was carried on day and night, and the greatest exertions were made
to provide the Division with shell-proof shelters with the minimum of
delay.
These dug-outs were designed to give 10 to 12 feet of head cover.
Charges of 60 lb. and 100 lb. of gun-cotton were exploded on the roofs
of dug-outs of this depth, and the shock of the explosion was
successfully resisted.[4]
Attempts were made to construct dug-outs by digging deep pits and then
roofing them in with layers of material calculated to burst shells; but
this was found to take more time than was required to construct a
dug-out by tunnelling.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account