The history of the Twentieth (Light) DivisionInglefield, Valentine Erskine
History
The history of the Twentieth (Light) Division
Inglefield, Valentine Erskine
Great Britain. Army. Division, 20th (Light); World War, 1914-1918 -- Regimental histories -- Great Britain
The 59th Brigade took over the right of the Divisional front on the
night of the 12th/13th, after some delay caused by the heavy shelling
of Poperinghe and Vlamertinghe. Next day the 61st Brigade went into the
reserve area in and about Poperinghe; Divisional Headquarters moved on
the 12th into hutments about two miles north-east of the town, and at 8
A.M. on the 13th Major-General Davies took over command of the
sector from the G.O.C. 14th Division.
Infantry action was over for a few days, during which the necessary
reliefs were carried out and work on the trenches begun. There was, of
course, a tremendous amount to be done to make a good line. Sixteen
hundred men of the 59th Brigade worked almost every night at this
time, and good progress was made during the month. The line of the
60th Brigade was worse than ever after the recent bombardments, which
had destroyed the parapets in many places, and in all parts of the
Divisional front shelling continued daily, hampering the working
parties and necessitating still more work. The canal bank was under
enfilade fire from some German guns, which did a good deal of damage
there and caused many casualties on the night of the 12th/13th.
The only bridge in the left sub-sector which could be used by day
was broken on the 13th, so that communication across the canal on
this flank was cut off until the R.E. had repaired the damage at 10
P.M. that night.
All companies of the R.E. and of the 11th D.L.I. were kept working hard
during the time spent in this sector, reclaiming the front line system
and improving communications. The field companies, working in the areas
of their brigades, constructed among other things extensive breastwork
trenches in No Man’s Land and a large number of framed machine-gun
emplacements with concrete head cover. The amount of work that was
done by the R.E. and infantry is indicated by the fact that at one
time an average of four tons of material was taken up to the line each
night from the workshops and dumps of the 96th Field Company alone.
The artillery did a great deal of work constructing new observation
posts and improving communications and battery positions. The 11th
D.L.I. were employed in digging and revetting trenches, putting out
wire, making dug-outs and machine-gun emplacements, sinking wells,
and repairing and relaying tramways. Later, in April, one company of
the battalion was sent to each of the brigades in the front line, and
a letter received from the C.R.E. on the 9th of the month especially
praised the work of these companies.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account