Three airplanes, the NC-1, 3 and 4, used in this flight were designed
and built through the joint efforts of the Navy and the Curtiss
Aeroplane Company. These four-engined seaplanes, the largest built up to
that time, exceeded the present-day Douglas DC-3 airplane in size and
weight. Although sufficient fuel could be carried for a sixteen-hour
flight, cruising airspeed was but eighty miles an hour. During the
winter months of 1918 to 1919, plans were made by the Navy, in
co-operation with the Weather Bureau, for securing as complete and
widely distributed weather reports as possible for the Atlantic area
immediately prior to and during the flight. Through international
co-operation, observations were available from Iceland, Western Europe,
Canada, and Bermuda.
From this network of reports, it was possible to draw fairly complete
weather maps and to follow in detail the various weather changes which
might affect the flight. There were several special features that
required consideration. For example, because of the heavy gasoline loads
aboard the planes, it was necessary that the wind at Trepassey Bay be
within certain rather narrow limits, strong enough to enable them to get
off the water, but not so vigorous as to damage the hulls or cause them
to upset. Similarly, the planes would need the help of a moderate
westerly wind in order to reach the Azores on the first leg of the
flight, but an excessive wind would cause rough seas, making an
emergency landing extremely hazardous. Thus the problem was to select a
day on which reasonably favorable conditions would be encountered, and
to get the planes away as early as possible, to minimize the cost of
maintaining the fleet at their positions. After four days of careful
analysis and waiting, the Weather Bureau representative at Trepassey
issued the following weather outlook on the afternoon of May 16, 1919:
“Reports received indicate good conditions for flight over the western
part of the course as far as Destroyer No. 12 (about six hundred miles
out). Winds will be nearly parallel to the course and will yield actual
assistance of about twenty miles per hour at flying levels. Over the
course east of Destroyer No. 12 the winds, under the influence of the
Azores high, recently developed, will be light, but mostly from a
southwesterly direction. They will not yield any material assistance.
“Weather will be clear and fine from Trepassey to Destroyer No. 8 (about
four hundred miles out); partly cloudy thence to the Azores, with the
likelihood of occasional showers. Such showers, however, if they occur,
will be from clouds at low altitudes, and it should be possible to fly
above them.
“All in all, the conditions are as nearly favorable as they are likely
to be for some time.”
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account