In the Houston Ship Channel, the material is composed of soft mud with
a small amount of sand. A two-mile stretch through Red Fish Reef is
practically self-maintaining. For the remainder of the channel, during
the six years from 1915 to 1920, a total excavation of 13,574,000 cubic
yards was necessary to maintain the depth. This is equivalent to
100,000 cubic yards a mile a year.
In summary, then:
1. The Lake Pontchartrain route is practically unexposed to cross
currents, as is the case with the Mobile Bay, Gulfport, Atchafalaya,
and, to a certain extent, the outer portion of the Houston Ship
Channels.
2. The material along and on the sides of the Pontchartrain route is,
with the exception of a small stretch, more tenacious, and contains, in
general, a greater proportion of sand than in the case of the
neighboring channels mentioned.
The channel could therefore be more easily maintained.
Engineers estimate that a channel with a 300-foot bottom would be
needed. On the south shore of the lake, the side slopes should be on
the 1 to 3 ratio, with provision for a 1 to 5 ratio at the end of five
years. Dumped on shore, the material would reclaim considerable
frontage, and eliminate the re-deposit of this material in the channel.
Through the remainder of the route, the original excavation should be
made with side slopes on the 1 to 5 ratio, with provision made for a 1
to 10 ratio in five years.
The dredging of the 75 miles of the Pontchartrain Channel would amount
to 97,200,000 cubic yards, it is estimated by engineers. The cost would
be around $10,000,000. The annual maintenance, during the first five
years, would amount to 8,880,000 cubic yards--an estimate based on a
comparison with the other channels into the Gulf, and the character of
the material to be excavated. This estimate is considered large--but
even at that, it is only 118,400 cubic yards a mile a year, and the
cost would be about $750,000, according to Colonel Dent. After five
years, it would be less.
Another proposed route, investigated by Colonel Dent, is through Lake
Borgne. A canal some miles in length, through the marsh, would connect
the lake with the Industrial Canal. This route has considerable
maintenance advantages over the Pontchartrain route. The character of
the bottom in Borgne is more or less the same as in Pontchartrain.
Sooner or later, one of these channels will be built by the government.
That it has not already been begun is due to the fact that the Canal
has not yet been completed, and the expected development has not taken
place. But there is no doubt that it will.
[Illustration: TYPICAL BRIDGE ON CANAL]
[Illustration: EMERGENCY DAM CRANE]
WHY GOVERNMENT SHOULD OPERATE CANAL.
Public-domain text, read in full here on John Shaqi.
The Industrial Canal and Inner Harbor of New Orleans: History, Description and Economic Aspects of Giant Facility Created to Encourage Industrial Expansion and Develop Commerce — John Shaqi
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account