“It is not in the accomplishment of this project (the interior
canal), that the real junction of the two Seas consists. This
problem will not be resolved, until the Isthmus shall present
a practicable opening, by which all ships may pass without
unloading. In order to this, it must be operated upon directly
from Pelusium to Suez; on this line the desert is narrower than
anywhere else. It is also in this direction, that the great
depression of which we have spoken extends, and at the bottom
of which the grand basin of the Bitter Lakes is situated.
Everything therefore points out this spot in the strip of land
for the construction of a canal. Everything, with one single
exception, which is, that there is not, they say, any port
at the extremity of this line of navigation; that of Suez
is partly filled up with sand, and upon the Mediterranean,
not a harbour, not a single roadstead, which now affords
any safety. Yet more, some travellers have stated, that if
it were required to form a port, it would be necessary to
contend against masses of sand, which, continually shifted
from west to east by a tolerably rapid current, seem to oppose
any maritime establishment upon that coast. In fact it is,
they say, for this reason that Alexander laid much farther to
the west the foundations of the town which bears his name,
and which he wished to become the emporium of the world. But
is the objection very serious at the present time? can the
obstacle, which occasions this anxiety, resist the constructive
means which are at the disposal of our engineers? We think
not. To create a port without the assistance of nature; to
put a restraint upon the sea; to reduce it to subjection; to
impose upon it an artificial roadstead; and to maintain that
roadstead, in spite of the natural causes operating to destroy
it: is a problem which has ceased to terrify modern art.
“Let us take the port of Pelusium,—see how easily the
difficulty would be removed! Suppose the Bitter Lakes to be
filled with the waters of the Arabian Gulf; by the action
of the tides alone, more than 700,000,000 cubic _metres_ of
water might be turned to account, the velocity of which would
constantly scour the channel, and prevent the accumulation of
sand at its mouth.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account