The jute industry : $b from seed to finished clothWoodhouse, Thomas
History
The jute industry : $b from seed to finished cloth
Woodhouse, Thomas
Jute fiber
A roving machine at work is shown in Fig. 19, and it will be seen
that the twisted sliver or rove on emerging from the drawing rollers
passes obliquely to the top of the spindle, through a guide eye,
then between the channel-shaped bend at the upper part of the flyer,
round the flyer arm, through an eye at the extreme end of either of
the flyer arms, and finally on to the bobbin. Each bobbin has its
own sliver can (occasionally two), and the sliver passes from this
can between the sides of the sliver guide, between the retaining
rollers, then amongst the gill pins of the fallers and between the
drawing (also the delivery) rollers. Here the sliver terminates
because the rotary action of the flyer imparts a little twist and
causes the material to assume a somewhat circular sectional form.
From this point, the path followed to the bobbin is that described
above.
As in all the preceding machines, the delivery speed of the sliver
is constant and is represented by the surface speed of the periphery
of the delivery rollers, this speed approximates to about 20 yards
per minute. The spindles and their flyers are also driven at a
constant speed, because in all cases we have--
spindle speed = delivery x twist.
There is thus a constant length of yarn to be wound on the rove
bobbin per minute, and the speed of the bobbin, which is driven
independently of the spindle and flyer, is constant for any one
series of rove coils on the bobbin. The speed of the bobbin differs,
however, for each complete layer of rove, simply because the
effective diameter of the material on the bobbin changes with the
beginning of each new layer.
The eyes of the flyers always rotate in the same horizontal plane,
and hence the rove always passes to the bobbins at the same height
from any fixed point. The bobbins, however, are raised gradually by
the builder during the formation of each layer from the top of the
bobbin to the bottom, and lowered gradually by the builder during
the formation of each layer from bottom to top. In other words, the
travel of the builder is represented by the distance between the
inner faces of the flanges of the rove bobbin.
[Illustration: FIG. 19 ROVING FRAME FAIRBAIRN'S ROVING FRAME IN WORK]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account