Owing, however, to vexatious delays in the erection of the engine-houses
and engines, it was not until the commencement of 1847 that a
piston-carriage was able to traverse the first six miles out of Exeter.
And, though repeated experimental trains continued to be run, no
passengers had been conveyed by Atmospheric trains prior to the general
meeting of the shareholders, at the end of August. Mr. Brunel’s report
on this occasion was as follows:--
August 27, 1847.
It is a subject of great regret, and to no one more than to myself,
that we have as yet been unable to open any portion of the line to
the public with the Atmospheric apparatus, although a considerable
distance has for some months been in a state to admit of frequent
experiments being made upon it. This delay has arisen principally,
if not entirely, in that part of the whole system which it might
have been expected would have been the least exposed to it--namely,
the construction and completion of the steam-engines.
It is due to Mr. Samuda that I should say that, so far as regards
the mere pipe and valve, and other details which may be said to
constitute the Atmospheric apparatus, we might long since have
commenced. But the engines, although designed without any
interference with their plans, and furnished by the best makers of
the country, and although differing so slightly from the ordinary
construction of steam-engines, have proved sources of continued and
most vexatious delays, both in the unexpected length of time
occupied originally in their erection, and in subsequent correction
of defects in minor parts. While the engines were imperfect, it
would not only have been unwise to have commenced working the line,
even had it been practicable, but the frequent interruptions to the
continuous working of all the engines rendered it impossible to
complete and test the different portions of the Atmospheric
apparatus. There are still some defects to be remedied in one or
two of the engines, and I am using every endeavour, by persuasion
and by every other means in my power, to urge on the manufacturers
in their work of completion. Within the last week or two only have
we been able to work at all continuously between Exeter and
Teignmouth, so as to have the opportunity of trying the different
parts, and getting the various details requisite for actually
working trains tested and brought to sufficient perfection to
ensure efficiency and regularity.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account