The operation of drawing the tube across was commenced at a little after
nine o’clock, and by a quarter to ten the pontoon had reached the other
side safely, and the tube spanned the river. All proceeded with perfect
quiet and regularity under the management of Mr. Brunel, who was
assisted by Mr. Brereton and Captain Claxton. As soon as the pontoon
reached the further shore, the chains of the lifting tackles were
attached to the tube. The tube was lifted in the course of the day to
the level of the railway, and afterwards to its place on the top of the
piers, when the suspension chains and the rest of the truss were
attached to it. The bridge was opened for a single line of way on July
14, 1852. The second tube was floated in a similar manner to the first,
and the bridge was completed shortly afterwards.
The total cost of the Chepstow bridge was 77,000_l_.[103]
* * * * *
The Royal Albert Bridge, which carries the Cornwall Railway across the
River Tamar at Saltash, is the last and greatest of Mr. Brunel’s railway
works.
A railway into Cornwall, crossing the river Tamar, was proposed as early
as 1844. Mr. Brunel at one time thought of carrying the trains across on
a steam ferry similar to those which had been successfully introduced by
Mr. Rendel.
In 1845 a company was formed and an application made for an Act to
construct the railway either with a steam ferry at Torpoint or by a
bridge at Saltash. The latter plan was sanctioned by Parliament.
The height of the line shown on the section at the crossing of the Tamar
was 80 feet above high water. The Admiralty, however, required that this
height should be increased. No further steps were taken till the
beginning of 1847, when some preliminary borings and sections were made,
in order to prepare definite plans for the bridge. The facts then
ascertained were so encouraging as to strengthen Mr. Brunel in his
opinion that the difficulties to be encountered would not be found
greater than had been anticipated.
The river at Saltash is 1,100 feet wide, with a depth in the middle of
about 70 feet at high water. It had at first been intended to construct
the bridge with one span of 255 feet, and six of 105 feet, with
superstructures of timber-trussed arches.[104] In compliance with the
requirements of the Admiralty, the design was altered to two spans of
300 feet, and two of 200 feet, with a clear headway of 100 feet. This
arrangement would have required three piers in deep water. Mr. Brunel
subsequently decided to have only one pier in deep water, and to have
two spans of 465 feet each. It was afterwards found that these could be
reduced to 455 feet.[105]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account