Twenty years before, while engaged with his father on the Thames Tunnel,
he had conceived the idea of working under a diving-bell of great
dimensions. Sir Isambard approved of the suggestion, and thought of
applying it in sinking the shafts of the Tunnel. Drawings were prepared,
but the circumstance of a patent for a similar idea having been taken
out by Lord Cochrane partly deterred him from carrying out the project,
though some sketches were afterwards made for constructing a lighthouse
by means of this arrangement. When the construction of the Cornwall
Railway had to be considered, Mr. Brunel thought that his old idea would
be applicable to the difficulties to be encountered at Saltash.
Although the plan of using a large diving-bell was one which was nearly
certain to be successful, Mr. Brunel thought it probable that a large
cylinder of wrought iron could be constructed to serve as a coffer-dam,
and that after sinking it through the mud, the bottom edge might be
sufficiently water-tight to admit of the water being pumped out, and the
masonry of the pier built in the ordinary manner.
A trial cylinder, 6 feet diameter and 85 feet long, was made, partly to
ascertain whether or not this plan was practicable, but mainly for the
purpose of thoroughly examining the site of the centre pier, where the
surface of the rock was 80 feet below high water.
A strong framework was fitted on two gun-brig hulks, with powerful
tackle for lowering and raising the cylinder. After it had been lowered
to the bottom, five borings were taken within it, reaching through the
mud to the rock. The cylinder was then shifted and similar borings made.
The positions of the borings, one hundred and seventy five in all, were
carefully recorded; and thus a minute and accurate survey was obtained
of the surface of the rock. The site of the pier was afterwards
determined by means of a model constructed from these observations. In
January 1849, when sufficient information had been obtained, the water
was pumped out of the trial cylinder, and the mud excavated down to the
rock. A short piece of masonry was then built, to demonstrate the
practicability of building a pier in such a situation.
The expenditure of the Company for works of all kinds was shortly
afterwards curtailed as much as possible, and no further progress was
made for upwards of three years. However, information had been gained
which proved that a masonry pier could be built in the middle of the
river, on a good rock foundation which was there covered by a thickness
of about 16 feet of mud.
During the suspension of the works, all the plans were revised, with the
view of reducing the first cost wherever practicable; and Mr. Brunel
decided not to make the bridge for a double line, even if there were
money forthcoming to do so. His reason for this is given in the
following report to the Board of Trade, made in 1852:--
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account