In the task of lifting the truss, as well as in that of floating it, Mr.
Brunel had the great advantage of the experience gained at the Britannia
Bridge. There the piers were built first, and the tubes hauled up with
link chains by hydraulic presses placed on the tops of the towers. The
design of the piers at Saltash did not allow of this plan being adopted,
and they were built up under the truss as it was lifted. Under each end
of the truss were three hydraulic presses; the two outside presses
combined, or the middle one by itself, were sufficient to lift the
weight. Mr. Brunel had also at first intended to have strong
screw-jacks, which were to be kept screwed up underneath the truss, and
so to support the weight, if by any accident the presses failed. A
modification of this plan was adopted; the rams of the presses had a
screw thread cut on them, and a large nut on each was kept screwed up
hard against the top of the press as the ram emerged from it. As an
additional precaution, timber packing, in thin layers, was placed in the
space between the completed portion of the pier and the end of the truss
as it was lifted. Great care was thus taken to guard against any mishap.
The tube was lifted 3 feet at a time at each end. The operation went on
slowly, in order to allow the masonry of the land pier to set after it
had been built up underneath the truss. The work was carried on with
great system and care under the immediate superintendence of Mr.
Brereton. Mr. Brunel was only able to be present during one of the
lifting operations, as he was then engaged in the launch of the ‘Great
Eastern.’
* * * * *
By July 1858, the first truss had been lifted to its full height, and
the second truss was ready for floating. The arrangements were generally
similar to those on the previous occasion; the course, however, to be
traversed by the pontoons was more intricate than on the previous
occasion, as the land pier on the Devonshire side of the river, over
which the first truss had passed, had been built up to receive the end
of the second.
This truss had, therefore, to be moved first outwards till the pontoons
were clear of the docks, then it had to move endways up the river, and
to swing round into position. Mr. Brunel was obliged to remain abroad
from ill-health, and Mr. Brereton conducted the operations. Although the
weather was not favourable, and the wind high, the truss was safely
landed on the piers; and was afterwards raised in the same manner as the
first one.[114]
The general elevation, Plate V., shows the proportions of the bridge. On
the Devonshire side, the side spans pass over fields, and on the
Cornwall side over the town of Saltash.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account