First, as to the comparative merits of the plans, I consider them
both excellently adapted to our particular case, and that the
choice will depend upon other circumstances than the construction
of the engines, and these circumstances, I consider, would be, the
relative cost and the advantages of forming an establishment which
will eventually become necessary for the repair and maintenance of
our engines, contrasted with all the advantages to be derived from
the responsibility and experience in all the details of a
first-rate manufacturer, and to which I attach very great value,
particularly in the early proceedings of a Company like ours. As
regards the cost, I understand Messrs. Maudslay’s tender to be for
an engine of four 75-inch cylinders, which is equal to a pair of
ordinary engines of about 106 inches.
Engine, boiler, and paddle-wheels, fixed on board, supposing the £
vessel in London, and with reduced size of boiler, 41,400
Deduct allowance for coal-boxes and combings for hatchways as proposed
by Messrs. Maudslay, 500
40,900
Additional expense incurred by Messrs. Maudslay in consequence of
the engines being fixed on board at Bristol instead of London, I
estimate at, 250
Total amount to be paid Messrs. Maudslay, 41,150
In addition to this will be the freight and insurance, which we are to
pay, and also the unloading at Bristol and placing in the vessel,
which I take at Captain Claxton’s estimate, 2,000
Making a total of 43,150
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account