It must be borne in mind that the screw engines will be the largest
engines that have yet been made. The principal part of the
propelling power of the ship will be thrown upon the screw; and
upon these engines therefore will mainly depend the performance of
the ship, and particularly upon their constant never-failing
working, probably for thirty or forty days and nights, must depend
the certainty of the ship’s performance.[145] Under all these
circumstances, the compactness and stiffness of framing, the
greatest possible simplicity of construction, and the fewest
possible number of parts, and, finally, the absence of any novelty,
however promising, that can introduce any unforeseen difficulties,
are conditions which would outweigh in my mind many advantages that
might, and I think would, be attained by several arrangements which
have been suggested.
All the designs now submitted comply with these conditions to a
very considerable extent ... but the extreme simplicity of Mr.
Blake’s engine leads me to prefer it.
As regards the paddle engine, I unhesitatingly give the preference
to that proposed by Mr. Russell. I believe it to be as simple an
arrangement as can be adopted for engines with such a slow motion
and so long a stroke as these must have, and the single crank in
the centre I consider a great advantage....
As regards a contract for the ship, I have found it more difficult
to proceed in the ordinary course. The conditions which we must
ensure of quality of workmanship and execution, under close
inspection and within reach of one’s own supervision, are not
easily attained; and, though as a matter of course readily promised
and undertaken by all ship-builders, they are rarely secured. It is
essential also that the ship should be built where the engines can
be readily fixed on board before launching, and in a yard which can
be devoted to the purposes of the ship, and whence the launching
can be effected with the engines and boilers on board.
All these are conditions not easily secured. I have been in
communication with one or two parties, and the result is a tender
from Mr. J. Scott Russell, which I enclose, and which has in fact
been framed upon my calculations. Owing to the recent rise in iron
it is somewhat, but not materially, above the amount at which I had
originally estimated the vessels; but the tender, founded upon the
supposition of two such vessels being ultimately ordered, is as
nearly as may be the same as my original estimate, and upon the
whole I consider the tenders both for engines and ships very
satisfactory and confirming fully our previous calculations.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account