7. Report to the Directors of the South Devon Railway Company,
recommending them to adopt the Atmospheric System (August 19,
1844).....138
The question had been frequently considered by him (p. 138)--Stationary
power is cheaper and otherwise better than locomotive power (p.
138)--The Atmospheric System is a good, economical mode of applying
stationary power (p. 138)--Reasons for considering it applicable to the
South Devon Railway (p. 139)--In the construction of the line (p.
140)--In the subsequent working (p. 141).
8, 9. Letters on giving Evidence before the Select Committee of the
House of Commons on the Atmospheric System (March 31, 1845; April 3,
1845).....145
10. Report to the Directors of the South Devon Railway on the State of
the Atmospheric Apparatus (August 27, 1847).....149
Regret at postponement of working (p. 149)--Which has been caused by
delay in completion of the engines (p. 149)--Experimental trains have
run (p. 149)--Difficulties have exceeded all just anticipations (p.
150).
11. Report to a Committee of the Directors of the South Devon Railway
Company on the Causes of the Failure of the Atmospheric System (August
19, 1848).....159
The first difficulty has been in the stationary engines, which have
consumed an excessive amount of fuel (p. 159)--The difficulties in the
working of the longitudinal valve have been more numerous (p. 161)--The
principal evil might be remedied in a new valve (p. 162)--An extension
of the system beyond Newton cannot be recommended (p. 162)--The delay in
obtaining the telegraph has been a great disappointment (p. 163).
12. Letter on the Design of Engineering Works (December 30,
1854).....178
13. Extract from Letter on the Use of Cast Iron in Bridge Construction
(April 18, 1849).....190
14. Extract from Letter on the same Subject (March 13, 1848).....192
15, 16, 17. Extract from Letters on Bridges of Large Spans (January 31,
1852; December 1, 1852; May 30, 1854).....212
18. Extract from Report on the Cornwall Railway as to making the Saltash
Bridge for a Single Line (February 5, 1852).....214
19. Report to the Directors of the Great Western Steam-Ship Company on
the Selection of the Builders of the Engines for the ‘Great Western’
Steam-ship (June 18, 1836).....235
Every means must be taken to secure the best engines possible in this
the boldest attempt yet made (p. 235)--The peculiar conditions required
in these engines (p. 235)--They must, as far as is possible, be perfect
in all their details from the moment of their completion (p. 235)--The
machinery required is by no means an ordinary steam-engine (p.
236)--Modifications necessary in designing engines of so large a size
(p. 236)--Reasons based on these considerations for preferring Messrs.
Maudslay and Field as builders of these engines (p. 236).
20. Letter on the Engines for the ‘Great Britain’ Steam-ship (June 12,
1839).....249
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account