33. Report to the Directors of the Eastern Steam Navigation Company on
mode of Proceeding (July 21, 1852).....296
34. Report on Enquiries relating to the Draught and Form of the Great
Ship (October 6, 1852).....297
35. Report on the Dimensions of the Great Ship (March 21, 1853).....299
36. Report on the Tenders for the Ship and Engines (May 18,
1853).....301
A short specification was drawn up for the engines, and detailed
drawings and specifications for the ship (p. 301)--Tenders have been
received for the engines from Mr. J. Scott Russell, Messrs. Watt and
Co., and Mr. Humphrys (p. 302)--After frequent communications with these
gentlemen, Messrs. Watt and Co.’s designs are preferred for the screw
engines, which will be the largest yet made, and on which will mainly
depend the performances of the ship (p. 302), and Mr. J. Scott Russell’s
for the paddle engines (p. 302)--As regards a tender for the ship, after
communications with several parties, the result is a tender from Mr. J.
Scott Russell (p. 303).
37. Extracts from Mr. Brunel’s Memoranda relating to the ‘Great Eastern’
Steam-ship (July 11, 1852, to November 18, 1853).....304
July 11, 1852: Dimensions of the ship (p. 304)--Division of power
between the screw and paddle engines (p. 305)--Every known means must be
adopted to ensure efficiency (p. 305)--Jacketing of steam pipes, &c. (p.
305). July 17, 1852: Conference with Mr. Field as to division of power
between the screw and paddle engines (p. 305)--Pressure of steam (p.
305)--Nothing uncertain must be risked (p. 305)--Jacketing (p. 305).
July 19, 1852: Strong bulkheads every 30 feet or thereabouts, and the
main ribs, and even at least two main deck beams, to be longitudinal,
instead of transverse (p. 305). February 2, 1853: Present views as to
the construction of the ship and engines (p. 306)--Boilers (p.
307)--Advantages of oscillating engines for both screw and paddle
engines (p. 307). February 21, 1853: Proper dimensions for the Calcutta
line (p. 308)--Gas (p. 308)--Ventilation (p. 308)--Steering (p. 308).
March 14, 1853: Dimensions now determined on (p. 308). March 22, 1853:
Various dimensions settled (p. 308). April 28, 1853: Tenders are being
sought for (p. 308)--Arrangements for measuring the coal (p. 309)--Use
of clean water (p. 309). August 7, 1853: Memoranda for engines (p. 309).
November 18, 1853: Governors (p. 309)--Auxiliary engine and boiler (p.
309).
38. Extracts from Mr. Brunel’s Memoranda relating to the ‘Great Eastern’
Steam-ship (February 25 to March 10, 1854).....310
February 25, 1854: Thought and labour involved in the details of the
construction both of the ship and engines (p. 310)--Cabin arrangements
(p. 310)--Economy of material in the construction of the ship (p.
310)--A matter generally neglected in shipbuilding (p. 310)--All this
misconstruction forbidden (p. 311). March 3, 1854: Details of screw
engines (p. 311). March 10, 1854: Details of ship (p. 311).
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account