The Life of Thomas Telford, Civil Engineer: With an Introductory History of Roads and Travelling in Great BritainSmiles, Samuel
History
The Life of Thomas Telford, Civil Engineer: With an Introductory History of Roads and Travelling in Great Britain
Smiles, Samuel
Civil engineers -- Great Britain -- Biography; Roads -- Great Britain; Telford, Thomas, 1757-1834
Upon the top of the masonry was set the cast iron trough for the
canal, with its towing-path and side-rails, all accurately fitted
and bolted together, forming a completely water-tight canal, with a
water-way of 11 feet 10 inches, of which the towing-path, standing
upon iron pillars rising from the bed of the canal, occupied 4 feet
8 inches, leaving a space of 7 feet 2 inches for the boat.*[6]
The whole cost of this part of the canal was 47,018L., which was
considered by Telford a moderate sum compared with what it must
have cost if executed after the ordinary manner. The aqueduct was
formally opened for traffic in 1805. "And thus," said Telford, "has
been added a striking feature to the beautiful vale of Llangollen,
where formerly was the fastness of Owen Glendower, but which, now
cleared of its entangled woods, contains a useful line of
intercourse between England and Ireland; and the water drawn from
the once sacred Devon furnishes the means of distributing
prosperity over the adjacent land of the Saxons."
[Image] Section of Top of Pont-Cyslltau Aqueduct.
It is scarcely necessary to refer to the other works upon this
canal, some of which were of considerable magnitude, though they
may now seem dwarfed by comparison with the works of recent
engineers, Thus, there were two difficult tunnels cut through hard
rock, under the rugged ground which separates the valleys of the
Dee and the Ceriog. One of these is 500 and the other 200 yards in
length. To ensure a supply of water for the summit of the canal,
the lake called Bala Pool was dammed up by a regulating weir, and
by its means the water was drawn off at Llandisilio when required
for the purposes of the navigation; the navigable feeder being six
miles long, carried along the bank of the Llangollen valley.
All these works were skilfully executed; and when the undertaking
was finished, Mr. Telford may be said to have fairly established
his reputation as an engineer of first rate ability.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account