It will be understood that many years elapsed between the period at
which Telford was appointed engineer to the Ellesmere Canal and the
designing of these gigantic works. He had in the meantime been
carefully gathering experience from a variety of similar
undertakings on which he was employed, and bringing his
observations of the strength of materials and the different forms
of construction to bear upon the plans under his consideration for
the great aqueducts of Chirk and Pont-Cysylltau. In 1795 he was
appointed engineer to the Shrewsbury Canal, which extends from that
town to the collieries and ironworks in the neighbourhood of
Wrekin, crossing the rivers Roden and Tern, and Ketley Brook, after
which it joins the Dorrington and Shropshire Canals. Writing to his
Eskdale friend, Telford said : "Although this canal is only
eighteen miles long, yet there are many important works in its
course--several locks, a tunnel about half a mile long, and two
aqueducts. For the most considerable of these last, I have just
recommended an aqueduct of iron. It has been approved, and will be
executed under my direction, upon a principle entirely new, and
which I am endeavouring to establish with regard to the application
of iron."*[4]
It was the same principle which he applied to the great aqueducts
of the Ellesmere Canal now under consideration. He had a model made
of part of the proposed aqueduct for Pont-Cysylltau, showing the
piers, ribs, towing-path, and side railing, with a cast iron trough
for the canal. The model being approved, the design was completed;
the ironwork was ordered for the summit, and the masonry of the
piers then proceeded. The foundation-stone was laid on the 25th
July, 1795, by Richard Myddelton, Esq., of Chirk Castle, M.P., and
the work was not finished until the year 1803,--thus occupying a
period of nearly eight years in construction.
The aqueduct is approached on the south side by an embankment 1500
feet in length, extending from the level of the water-way in the
canal until its perpendicular height at the "tip" is 97 feet;
thence it is carried to the opposite side of the valley, over the
river Dee, upon piers supporting nineteen arches, extending to the
length of 1007 feet. The height of the piers above low water in the
river is 121 feet. The lower part of each was built solid for 70
feet, all above being hollow, for the purpose of saving masonry as
well as ensuring good workmanship. The outer walls of the hollow
portion are only two feet thick, with cross inner walls. As each
stone was exposed to inspection, and as both Telford and his
confidential foreman, Matthew Davidson,*[5] kept a vigilant eye
upon the work, scamping was rendered impossible, and a first-rate
piece of masonry was the result.
[Image] Pont-Cyslltau Aqueduct
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account