In the last thirty years there has been an awakening to the opportunity
that lies in the arid West for the homemaker, and a remarkable
transformation has taken place in many parts of this region. Irrigation
canals long enough to girdle the globe three times now distribute
the normal flow and the stored water of Western streams to millions
of acres, which support hundreds of thousands of contented farmers.
Cities, populous and great, have sprung up, rural communities,
attractive and prosperous, broad vistas of fertile fields and
blossoming orchards have replaced the wastes of sand and sage brush.
WRITTEN ESPECIALLY FOR THE MENTOR BY C. J. BLANCHARD
ILLUSTRATION FOR THE MENTOR, VOL. 6, No. 17, SERIAL No. 165
COPYRIGHT, 1918, BY THE MENTOR ASSOCIATION, INC.
[Illustration: HIGH LINE CANAL, UTAH VALLEY, UTAH]
_RECLAIMING THE DESERT_
_Skyline Canals_
TWO
Locating and excavating several of the main canals proved almost
as difficult and trying as the building of the big dams. This was
especially true in the Yakima and Okanogan valleys in Washington,
the St. Mary and Flathead in Montana, Uncompahgre and Grand River in
Colorado, and the Utah valley, Utah. These canals cling to the edges of
deep and precipitous canyons, or hug the steep mountain slopes. Here
and there huge aqueducts of reinforced concrete span the chasms. For
miles the water is siphoned across broad ravines in iron-banded stave
pipe, or flows in tunnels through the cliffs.
The Tieton main canal of the Yakima project, Washington, for a distance
of twelve miles is through a very rough country. It is cement lined
throughout, and for two miles is in tunnels. For the greater part of
its length it hugs the side of the canyon, in places 500 feet above the
river. The lining for the canal was molded on the river bank, where
water, sand, and gravel were available for concrete making, and the
forms were carried to the top of the canyon by tram and cableways.
The capacity of the canal is 300 cubic feet per second, and it is now
irrigating 40,000 acres. The High line Canal of the Strawberry Valley
project swings around the steep slopes of the Spanish Peaks of the
Wasatch Range in Utah for several miles. At one point a portion of the
water is dropped in pipes to the turbines, where power is developed and
distributed to several towns in the valley. At various points along its
course the canal is covered with a reinforced concrete roof to prevent
injury and filling up from avalanches in the spring.
WRITTEN ESPECIALLY FOR THE MENTOR BY C. J. BLANCHARD
ILLUSTRATION FOR THE MENTOR, VOL. 6, No. 17, SERIAL No. 165
COPYRIGHT, 1918, BY THE MENTOR ASSOCIATION, INC.
[Illustration: GUNNISON TUNNEL. COLORADO]
_RECLAIMING THE DESERT_
_The Gunnison Tunnel_
THREE
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account