The cab is fastened into position; then the boiler-makers descend upon the
unfinished engine and place the 200 or more flue-tubes that run from
fire-box to smoke-box, just underneath the stack. They make every tube and
joint fast--put into the growing locomotive all the energy and all the
skill of good workmanship. When they are gone the giant crane again comes
noiselessly down along the ceiling. It reaches down, grasps the
engine-trunk, and swings it high aloft.
Down there, resting on real railroad tracks, are the driving-wheels and
the lead truck, carefully spaced in anticipation. The crane, lifting the
fifty tons of boiler and frame with no apparent effort whatsoever, places
its load squarely upon the wheels that are to carry it. Again the
mechanics are busy; the engine is growing into a solid unit. Upon their
heels follow testers, men who must look for steam or water leaks. They
work under a test of air, carrying lighted candles into every nook and
cranny of the giant. If the candle flutters, air is escaping, and the leak
must be found.
Finally comes the report "O. K." from the testing crew. The stacks, the
steam and sand domes, and the air-brakes are being made fast. The engine
is hurried off to the paint-shop. There it may find its companion in life,
the humble useful tender already awaiting it. It came direct from the
tender shop; for the appendage of the locomotive is no longer a specially
rigged flat-car but a solid steel plate construction built to carry some
9,000 gallons of water and about 16 tons of coal. Only a little time ago,
a New Yorker, scion of a wealthy and famous family of railroaders, proved
himself worth his oats by designing a tender of great practicability and
of great economy of construction.
When the engine emerges from the paint-shop it is gorgeous and
refulgent--brilliantly new. Unless it is going to foreign lands, when it
must be partly dismantled and crated, it will ride its own wheels to the
road which has purchased it. A string of new locomotives may be sprinkled
through a freight train--never coupled together--in charge of an inspector
from the locomotive company, who will bunk in one of the cabs and never
leave his charges until they have been receipted for. After that the
locomotive begins to bend to the work for which he was created. Unless he
is of a very unusual sort or was built for some very especial purpose, he
soon loses his identity. The days are gone when locomotives were
christened after the fashion of ships. There are too many of them. Each is
given the cold informality of a number, marshalled for service in a mighty
company.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account