The bridge problem is always different, it constantly has the fascination
of variety. That variety will come into play at unexpected turns. Once,
down in a deep Colorado cañon, whose walls rose precipitously for a
thousand-odd feet, and which was all but filled by a deep and rapid river,
the engineers of the Rio Grande & Western found absolutely no ledge
whatsoever upon which they might rest their rails. They puzzled upon the
problem for a little while, and then they swung a girder bridge parallel
with the river. The bridge was supported by braced girders, that fastened
their feet in the walls of the cañon, hardly wider there than a narrow
city house. The railroad has been running over that construction for more
than thirty years; it is one of the scenic wonders of the land, and a
triumph for the engineer that built it. In constructing the expensive West
Shore Railroad up the Hudson River, similar difficulties were experienced
south of West Point, and truss bridges were built parallel with the steep
river banks to carry the tracks from ledge to ledge. It is not an unusual
matter for the construction engineer to spend a quarter of a million
dollars to span some deep, waterless gully in the mountains, which could
not be filled for more than twice that sum.
Many times, in these days of increasing weight of equipment, it becomes
necessary to replace a bridge, without interrupting the traffic. The
construction engineer never fails to meet the problem. Years ago, he took
Roebling's famous suspension bridge at Niagara Falls, removed the stone
towers and replaced them with towers of steel, without delaying a single
train; and a little later he took that bridge itself, and substituted a
heavy cantilever for it, while all the time a heavy traffic poured itself
over the structure. The rebuilder of bridges works like the original
builder--with plentiful falsework. He timbers in and around his structure,
and then step by step and with exceeding caution removes the old and
substitutes the new. An old girder is taken out between trains; before
another train of cars shall roll over the structure a new one is ready,
temporarily bolted until the riveters can make it fast. It sounds
complicated, but it is remarkably simple, under the careful plans of a
patient engineer, who has that infinite thing that we call genius.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account